fms connectivity n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
FMS Connectivity PowerPoint Presentation
Download Presentation
FMS Connectivity

Loading in 2 Seconds...

play fullscreen
1 / 10

FMS Connectivity - PowerPoint PPT Presentation


  • 65 Views
  • Uploaded on

FMS Connectivity. Customer Advisory Board Meeting Las Vegas – December 12, 2006 Presented By: Denise Quirarte Kansas City Financial Center. Topics. Connectivity for Disaster Recovery Purposes PAM - Kansas City Regional Operations Center (KROC) as Primary Payment Processing Site

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'FMS Connectivity' - hye


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
fms connectivity

FMS Connectivity

Customer Advisory Board Meeting

Las Vegas – December 12, 2006

Presented By:

Denise Quirarte

Kansas City Financial Center

topics
Topics
  • Connectivity for Disaster Recovery Purposes
  • PAM - Kansas City Regional Operations Center (KROC) as Primary Payment Processing Site
  • Decommissioning of Hyattsville Regional Operations Center (HROC).
currently
Currently
  • Majority of payment processing is done on the HROC platform (with the exception of SSA/SSI Monthly payments which process on KROC).
  • Customer agencies transmitting bulk files have a dedicated line or Frame Relay connection to HROC.
  • Several customer agencies have dedicated lines or Frame Relay connections to both HROC and KROC (for contingency).
currently1
Currently

Current Connectivity

KROC

HROC

FPA

Few Agencies

Most Agencies

what s coming
What’s Coming
  • PAM will process all payments on KROC. Processing will be implemented in releases between 2007 and 2009.
  • HROC is being decommissioned Sept 2009.
  • KROC will be the primary processing site.
  • Bureau of Public Debt (BPD) will become the contingency processing site.
preferred connectivity method
Preferred Connectivity Method
  • The Preferred method of implementation is IP over Sprint’s MPLS Private Internet Protocol (PIP).
    • Note: Sprint is discontinuing Frame Relay.
  • This method provides connectivity to HROC and KROC now and KROC and BPD in the future.
what s coming1
What’s Coming
  • Future Connectivity

KROC

BPD

SPRINT (MPLS) PIP

FPA

benefits of mpls
Benefits of MPLS
  • Reduces Network Connections
    • Only requires one line from the agency to Sprint.
  • Better Contingency Management
    • Connectivity to the contingency site eliminates the need for cartridge or CD use if the primary site is down.
  • Switchover in a contingency is transparent to the Agency
next steps
Next Steps
  • Verification and documentation of current connectivity:
    • KFC has contacted each Agency that transmits Bulk Files
  • FMS Network Engineering:
    • Assist Agencies with questions and planning
    • Provides a connectivity guide as a reference (included)
    • Will provide a customized network proposal.
    • Please identify yourself as a KFC customer.
  • KFC:
    • Performs testing with the Agency following line installation.
    • Will work with each Agency to ensure adequate connectivity is in place prior to the upcoming FMS changes.
contacts
Contacts
  • KFC:
    • Paul Jackson 816-414-2310

Paul.Jackson@fms.treas.gov

    • Eugene Phillips 816-414-2328

Eugene.Phillips@fms.treas.gov

  • Network Engineering:
    • Joseph Mendez 202-874-7099

Joseph.Mendez@fms.treas.gov