1 / 4

Data Analysis & Simulation Issues Theo Alexopoulos, NTUA Planning meeting, 14.03.2012

Data Analysis & Simulation Issues Theo Alexopoulos, NTUA Planning meeting, 14.03.2012. Test beam activities (@H6, July & Oct 2012 periods ) Simulation. Test beam analyses e xisting analyses: ALTRO, APV, old BNL elx s hort-term needs: need software for BNL VMM1 chip; MM in ATLAS

hue
Download Presentation

Data Analysis & Simulation Issues Theo Alexopoulos, NTUA Planning meeting, 14.03.2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Analysis & Simulation Issues Theo Alexopoulos, NTUA Planning meeting, 14.03.2012

  2. Test beam activities (@H6, July & Oct 2012 periods) • Simulation Test beam analyses existing analyses: ALTRO, APV, old BNL elx short-term needs: need software for BNL VMM1 chip; MM in ATLAS long-term needs: develop a tracking program short-term: July 2012 Simulation issues existing analyses: homemade standalone MC for NSW emphasizing on timing trigger studies short-term needs: optimize the trigger schema parameters; trigger scheme for FPGA implementation long-term needs: Integration of MM-MC into Athena framework

  3. TEST BEAM SETUP Oct2011 (14.10.2011-21.10.2011) Jura 300 run<=6989 322 7007<run>=6990 16.10..2011, 11:30 425 78 113 78 TOP VIEW 1406 CR2-r Large mm μM-R20 stripsX μM-R18 stripsY μM-R21 stripsYX veto Sci s360 s360 44 725 2 2 Beam profile wire chamber x 100 10 20 20 20 μM-R19G stripsXUV s640 z 26 26 26 15 finger Sci (SA) y 170 10 2 s1 Si1 Si3 SC Si6 SB (π-,+120GeV/c) Y-inverted SB SD s1 s1 s1 Saleve movable table 16 4730 SIDE VIEW y s1 s1 s640 s1 26 26 26 z x x s640 s640 s1 Si1 Si6 Si3 50 (π-,+120GeV/c) Y-inverted s360 1155 New movable table 16.10.11 19:30 rotate chambers by 20 degrees μM-R18 (X-Y) used only as Y-strip chamber

  4. Past test beam periods: • Nov 11: n run @ Garching • Oct11: R20, R18, R19G, R21, CR2; beam: π+120 GeV/c; position scan, HVdrift scan, angular scan, 93:7 & 85:15, at the end run MBT0 for few hrs; APV • Jul11: R14, R18, R9M, R19G, CR2, BNL-MM, LMU-MM telescope; beam: π-120 GeV/c; position scan, HVmesh scan, HVdrift scan, angular scan, target study, 93:7 & 85:15; APV, oldBNL-elx • Jan11: n run @ Demokritos • Oct10:R11, R12, R13, R14, R15; beam: π+80 GeV/c; position scan, HVmesh scan, HVdrift scan, angular scan, 93:7 & 85:15; APV • Jul10: R11, R12, R13, P3; beam: π+120 GeV/c; position scan, HVmesh scan, HVdrift scan, angular scan, 93:7 & 85:15; ALTRO, oldBNL-elx on R13 • Nov09: P1, P3, R3, R4, S2(MM+GEM), Saclay MM Telescope; beam: π+120 GeV/c; position scan, HVmesh scan, HVdrift scan, angular scan, 93:7 & 85:15; ALTRO, oldBNL-elx • Sep09: n run @ Demokritos • Jul09: P1, P2, smallMM; beam: π+120 GeV/c; HVmesh scan, HVdrift scan, angular scan, T2K gas (Ar:CH4:Isobutane - 95:3:2) Small Micromegas on Ar:CO2

More Related