1 / 14

Fall Protection Systems

Fall Protection Systems. How long does it take to fall. Height Time (feet) (seconds ) 4 0.5 16 1.0 36 1.5

Download Presentation

Fall Protection Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fall Protection Systems

  2. How long does it take to fall • Height Time • (feet)(seconds) • 4 0.5 • 16 1.0 • 36 1.5 • 64 2.0 • 100 2.5 • 144 3.0

  3. CONUS Fatal Occupational Injuries (BLS) • Type of Exposure19971998 • 1. Transportation Incidents 2,599 2,630 • 2. Assault & Violent Acts 1,103 960 • 3. Contact w/Objects & Equipment 1,034 914 • 4. Falls 716 702 • 5. Exposure to Harmful Substances 550 572 • 6. Fires and Explosions 196 205 • 7. Other Events or Exposures 21 16

  4. Fall Protection Systems • Guard Rails • Safety Nets • Fall Arrest Systems

  5. Guardrail

  6. Safety Nets Safety net extension

  7. Connecting Means Shock Absorbing Lanyard Self retracting Lanyard Carabiner Snap Hook

  8. Body Support Full Body Harness

  9. Horizontal Lifelines HLL in a Hangar Typical HLL

  10. Vertical Lifelines Suspended Scaffold w/Independent Vertical Lifeline

  11. Ladder Climbing Devices Rope Grab Ladder Climbing Device System

  12. Positioning and Restraining Systems Positioning System Positioning System W/Vertical Lifeline Restraining system

  13. Warning Line System

  14. FP Importance During Planning and Design • Fall Protection Cost Profile • Conceptual design $1 • Final drawing stage $10 • Construction modification $100 • Startup & testing $1,000 • Maintenance $10,000

More Related