10 likes | 100 Views
This project involves monitoring mechanical constraints induced by quench during a 10kA test. Signals are analyzed in real-time to assess mechanical stress levels. Time-stamped data is gathered to study the effect of the quench event, striving for accurate measurements and analysis. The project, conducted at Saclay Muon Group, aims to enhance understanding of mechanical behavior during high-current tests.
E N D
inplane BML6C13 no signal inplane BOL1A13 signal=3µm? Monitoring of BT fast dumps • Monitoring of mechanical constraints induced by the quench • performed during 10kA test, quench at 2006-10-28 14:00 GMT projective 1A13RO: 10µm signal in time with quench. Mechanical stress ? inplane BOS2A04 no signal Saclay muon group