1 / 51

ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department

ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October 2011. ASTeC, DL. Electron-proton dipole. ISIS, FETS, ASTeC (IBG),RAL. Dipole moment ~1 C.m. Electric field at 1 m: ~10 GV/m.

hollie
Download Presentation

ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October 2011

  2. ASTeC, DL Electron-proton dipole ISIS, FETS, ASTeC (IBG),RAL Dipole moment ~1 C.m Electric field at 1 m: ~10 GV/m ~1030 Debye units

  3. Overview of talk • ISISScience programmeAccelerator R&DUpgrades • Front End Test Stand • Rôle of ASTeC

  4. But first — protons in the UK • At AERE1/Harwell/NIRNS2/RHEL/RAL: • Harwell synchrocyclotron (1949, 165 MeV, 1 µA) • PLA (Proton Linear Accelerator, 1959–1969)50 MeV, 3-tank — originally was to be 600 MeV • Harwell ~7 MV tandem accelerator • Harwell VEC (Variable Energy Cyclotron, 1965–1980s) • Nimrod, 7 GeV proton synchrotron (1964–1978) • ISIS, 800 MeV proton synchrotron (1984– ) • 1 Atomic Energy Research Establishment (1946) • 2 National Institute for Research in Nuclear Science (1957)

  5. Harwell tandem

  6. PLA — Proton Linear Accelerator

  7. Aimed down runway Never built

  8. PLA tank going into Building R12 at RAL

  9. PLA tank in R5.1 — as part of new injector for Nimrod

  10. Remedial work on other tanks for new injector for Nimrod

  11. PLA tank in R5.1 — as part of injector for ISIS

  12. Cockcroft at ground-breaking ceremony for Nimrod

  13. Construction of Nimrod synchrotron hall

  14. 4.6 MVA alternator (+ 5100 HP motor + 24 ton flywheel) × 2

  15. First beam from Nimrod

  16. ISIS • World’s most productive spallation neutron source(if no longer highest beam power) • Flagship STFC facility [Sci. Tech. Facilities Council] • Driven by UK’s high-power proton accelerators • UK has largest national neutron user community of any country • Accelerator physics at ISIS necessary for continuing operations— and also for enabling entire programmes on materials R&D • Need to plan for upgrades

  17. ISIS • Fundamental purpose — to investigate structure and dynamics of molecular matter • Neutron sources complement light sources • Neutrons: ~0.1 eV → ~1Å Structure Paracetamol Atomic motions

  18. Impact of ISIS science

  19. ISIS from air

  20. RFQ: 665 keV H–, 4-rod, 202 MHz Linac: 70 MeV H–, 25 mA, 202 MHz, 200 µs, 50 pps Synchrotron: 800 MeV proton, 50 Hz 5 µC each acceleration cycle Dual harmonic RF system [Chris Prior] Targets: 2 × W (Ta coated) Protons: 2 × ~100 ns pulses, ~300 ns apart Moderators: TS-1: 2 × H2O, 1 × liq. CH4, 1 × liq. H2 TS-2: 1 × liq. H2 / solid CH4, 1 × solid CH4 Instruments: TS-1: 20 TS-2: 7 (+ 4 more now funded) ~340 staff

  21. –35 kV H– ion source

  22. 665 keV 4-rod 202 MHz RFQ

  23. 70 MeV 202 MHz 4-tank H– linac

  24. 1.3–3.1 + 2.6–6.2 MHz 70–800 MeV proton synchrotron

  25. Superperiods 9, 0 and 1 of 800 MeV synchrotron

  26. Protons to TS-2 Protons to TS-1 EPB1 and EPB2 to TS-1 and TS-2 above synchrotron

  27. ISIS TS-1 experimental hall, 20 instruments

  28. ISIS TS-2 experimental hall, 7 instruments + 4 under way

  29. TS-1 tungsten target, plates

  30. TS-2 tungsten target, solid cylinder

  31. ISIS Upgrades 0) Linac and TS-1 refurbishment 1) Linac upgrade, ~0.5 MW on TS-1 2) ~3 GeV booster synchrotron: MW target 3) 800 MeV direct injection: 2–5 MW target 4) Upgrade 3) + long pulse mode option

  32. ISIS MW Upgrade Scenarios 1) Replace 70 MeV ISIS linac by new ~180 MeV linac (~0.5 MW) 2) ~3 GeV RCS fed by bucket-to-bucket transfer from ISIS 800 MeV synchrotron (1MW, perhaps more) 3) Charge-exchange injection from 800 MeV linac (2 – 5 MW) ASTeC staff vital to success

  33. Common proton driver for neutron source and neutrino factory • Based on MW ISIS upgrade • with 800MeV Linac and 3.2GeV RCS • Assumes a sharing of the beam • power at 3.2 GeV between the • two facilities • Both facilities can have the • same ion source, RFQ, chopper, • linac, H− injection, accumulation • and acceleration to 3.2 GeV • Requires additional RCS machine in • order to meet thepower and energy • needs of theNeutrino Factory

  34. NF on Harwell Oxford site • Extensive geological • survey data available, • but needs work to • interpret implications • for deep excavation and • ground water activation muon FFAG decay ring to Norsaq 155 m below ground • UKAEA land now • not to be • decommissioned • until at least 2040 • (unless we pay • for it!) RLA 2 RLA 1 muon linac cooling phase rotation bunching decay ring to INO 440 m below ground

  35. FETS — Front End Test Stand • Actually the second front end test stand at RAL • First test stand was built to test RFQ to replace ISIS Cockcroft-Walton

  36. ISIS 665 kV Cockcroft-Walton (1984–2004)

  37. 665 keV 4-rod 202 MHz RFQ RFQ test stand ion source, LEBT, RFQ, diagnostics

  38. Front End Test Stand (FETS) • Key technology demonstrator for next generation of high power pulsed proton accelerators • ISIS upgrades • Neutrino factories • Future spallation neutron sources • Accelerator-driven systems • Waste transmutation • ... • Only dedicated high-power proton accelerator hardware R&D project in the UK

  39. Key components of FETS • High-intensity, high-duty factor, H– ion source(60 mA, 2 ms, 50 pps) • Magnetic low energy beam transport (LEBT) • 324 MHz 4-vane RFQ • Medium energy beam transport (MEBT) • Very high speed beam chopper • Comprehensive beam diagnostics • Collaboration — ISIS, ASTeC, Imperial College, Warwick University, ESS Bilbao consortium, Royal Holloway,[Huddersfield, UCL]

  40. In R8 at RAL

  41. Ion source and LEBT optimisation 60 mA H–beam current demonstrated Low measured emittance at high current in the FETS LEBT

  42. RFQ design + manufacture RFQ cold model Integrated electromagnetic, thermal, fluid flow and mechanical design Weld test models under investigation at Imperial

  43. Beam chopper • Essential for all high-power proton accelerators with rings • FETS chopper • Two-stage for wide-band functionality • Basis for ESS design

  44. 4 metres

  45. Helical prototype Planar prototype Re-bunching cavities

  46. Beam diagnostics • Already in use • Current transformers • Faraday cup • Slit-and-cup scanners for time-resolved 2D emittance • Scintillators for beam profiles • Pepper-pot for 4D phase space • Being developed • Laser photo-detachment(“laser wire”)

  47. At present • Cutting metal for RFQ • Increasing laser power for laser wire • Continuing ion source development • … • In future • Commission RFQ • Demonstrate high-quality beam chopping • Spin out hands-on accelerator expertise • …

  48. ASTeC • Re-packaging of long-held national lab. skills— larger package than in the past • Skills  NINA, SRS, Nimrod, ISIS, Diamond, ... • “ASTeC” skills enabled / continue to enableNimrod  ISISESS designs (1990s, early 2000s)ISIS second harmonic RF upgradeTS-2 FETS • ISIS Accel. Theory Group  ASTeC Intense Beams Group (IBG) — IBG still in ISIS R2 building

More Related