An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 儘速辦理查估作業 調整作業順序 農民複估作業申請 敦親睦鄰 績優事蹟 4-1先行墊付救濟金:新亞公司於100年7月採先行墊付救濟金方式辦理,P50-P66施工障礙排除,不影響基樁施工。 4-2補償及協助真柏作物斷根、移植:新亞公司採補償及協助配合辦理P46真柏作物斷根、移植,於101年1月20日移植完成,不影響基樁施工。 1.協調承商於規劃施工網圖時,調整作業順序。 2. 100年3月協調芳苑鄉公所委託之查估公司,儘速辦理查估作業。 此於開工前未完成之程序,順利解決。並無造成工期展延之情事 192K+065~192K+920 路段因公有地未完成承租戶地上物查估補償作業,致施工之初即遭承租戶阻擾施工,影響P46及P50-P66橋墩施工,約佔全工區1/3,影響工程甚鉅,經主辦機關、監造單位及施工單位積極協調處理,順利解決施工障礙。 3.主動協助農民辦理複估作業申請,由工務段協助農民辦理複估及漏項補查估作業申請,加速處理作業。

  2. 績優事蹟 • 監造單位中工處第六工務段辦理工程自89年3月10日起,迄今共計4,969天無工安災害事故。 • 公路總局公路新工工程及管理101年度績效考評,評比獲頒新工楷模。 持續性地突破,不間斷地創新 我們渴望為平凡的工程帶來不平凡的品質,樹立標竿典範

  3. 績優事蹟 2011 12.26 101.9.7彰化縣縣長暨新聞媒體參訪 101.12.26交通部施工查核成績優良授獎典禮 102.07.19交通部公路總局北區工程處參訪 2011.10.19 101.10.19苗栗縣政府土木科參訪本工程SCC施作 2013.6.6 102.6.6建國科技大學參訪本工程

  4. 績優事蹟 在充分瞭解工程特性及依據契約內容之基礎下 安全 無虞 對本工程之監造確實做好材料、施工抽檢抽驗之工作,並督促廠商維持良好施工品質與環境,以使本工程達到左述目標。 品質 如質 進度 如期 工程 美觀

  5. 上百件工程是新亞的承諾與驕傲 秉持誠信為信念,本團隊始終努力不懈 本公司榮獲第15屆金峰獎(102年) 建設當下 • 築路未來 金質獎 公共 工程 永續 工程金質 盡心打造 耀眼金質・永續共榮