fastro n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
FASTRO PowerPoint Presentation
Download Presentation
FASTRO

Loading in 2 Seconds...

play fullscreen
1 / 9

FASTRO - PowerPoint PPT Presentation


  • 113 Views
  • Uploaded on

FASTRO. NEW PROCEDURE FOR THE CONSTRUCTION OF MASONRY BUILDINGS. NEW CONSTRUCTION SYSTEM. SIMPLE PROCEDURE - only two steps : 1 - Easy  stacking of special  blocks ( lightweight concrete )  -  from foundation to roof

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'FASTRO' - hilary-colon


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
fastro

FASTRO

NEW PROCEDURE

FORTHE CONSTRUCTION OF MASONRY BUILDINGS

slide2

NEW CONSTRUCTION SYSTEM

SIMPLE PROCEDURE - only two steps :

1 - Easy stacking of special blocks (lightweight concrete) - from foundation to roof

2 - Inflow (reinforced) standard concrete

slide3

NEW CONSTRUCTION SYSTEM

  • Eliminating problems of the ”THERMAL BRIDGES”
  • foundation
  • stairs
  • balcony
  • horizontal beams
  • plates (ceiling, floor)
  • roof surfaces
slide4

NEW CONSTRUCTION SYSTEM

formation of plate

slide5

NEW CONSTRUCTION SYSTEM

formation of wall

slide7

NEW CONSTRUCTION SYSTEM

wall coolingandheating

slide8

NEW CONSTRUCTION SYSTEM

  • INVESTMENTS AND THEIR JUSTIFICATION
  • total amount of investment: 1.700.000 €
  • payback time; 1 year
  • investment structure:           a)   credit: 1.700.000 € or
  • b) joint venture
  • gross income:  18.000.000 €/year
  • profit:10.800.000 €/year
slide9

NEW CONSTRUCTION SYSTEM

F A S T R O

bul. A. Čarnojevića 81