The L1 Cal Integration and Commissioning team has a revised schedule based on task requirements set by the Review Committee and Dan's guidance. Daily toolbox meetings have commenced, discussing project tasks and personnel assignments. The weekly schedule includes system reviews and progress updates on cable plant drawings, test card layouts, harness construction, and more. Notable achievements include successful data set testing and firmware downloading, ensuring the operational integrity of key connections. The overarching goal is to secure an ORC for full ADF crate testing.
E N D
L1_Cal Int/Comm • The L1_Cal Integration and Commissioning team has a new schedule based on the Review Committee’s charge and Dan’s thoughtful explanation of the work we need to complete to meet the charge requirements. • Task/Personnel/Status • Daily toolbox meetings started today.
Toolbox Meeting • Daily 9AM working toolbox meeting in DAB1. • Audio bridge available tomorrow.
July 12 Toolbox Minutes • Transition system reviews • Stone/Green/Jorge: Cable plant drawings. • Anderson/Green: Test card layout. • Rahmi/Cosmin: Glenair harness construction. • ADFTAB • Mike/Rahmi:Successfully ran pseudo random data set from ADFTAB for 2 hours with NO parity errors verifying operation of ATC LVDS connection. Order will be placed for balance of ATCs this week.
Toolbox minutes • GABTFW • Mike/Cory: Successfully downloaded and compiled GAB firmware. Verifying control lines. • L2/L3 • Nayeem/Sabine: Developing BOT trig file. • ORC • All: Goal is to obtain ORC for full ADF crate testing.