20 likes | 91 Views
Weekly testing update: Modules passed with A grade, transitioning to CCU25's configuration. See detailed results.
E N D
FNAL LT Testing Issues • Modules 30200020008064 – 8100 were tested during May 3-May 10 period. • Modules 30200020007961 - 7970 were retested. • All modules successfully passed LT with grade A. • All runs were performed with 2 CCU6’s. • Currently working on configuring 2 CCU25’s • (0x14 and 0x11).
Weekly Cumulative fFail Pass Fail Pass % Pass L12pu 0 0 0 0 0.00% L12pd 0 0 12 0 100.00% L12su 0 0 0 0 0.00% L12sd 0 0 0 0 0.00% 9150 L34p 37 0 1 99.33% L56p 10 0 104 0 100.00% R5N 0 0 0 0 0.00% 00 00 00 R5S 0 0.00% R6 0 0 0 0 0.00% R7 0 0 0 0 0.00% Total 47 0 266 1 99.62% FNAL LT Testing Status