off shore windpark projekt kaliningrad n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Off-Shore Windpark Projekt Kaliningrad PowerPoint Presentation
Download Presentation
Off-Shore Windpark Projekt Kaliningrad

Loading in 2 Seconds...

play fullscreen
1 / 17

Off-Shore Windpark Projekt Kaliningrad - PowerPoint PPT Presentation


  • 93 Views
  • Uploaded on

Off-Shore Windpark Projekt Kaliningrad. The Squad. Prof. Andrey Nikishin Gilbert Duee Berno Hellauer Max Mueller Andreas Rembold Aurelio Schug. Abbas Seifeddine Moritz Schneider Kevin Weber Sebastian Westphal. 1 - Aims of the project 2 - What we did in the project

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Off-Shore Windpark Projekt Kaliningrad' - henry-bernard


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
the squad
The Squad

Prof. Andrey Nikishin

  • Gilbert Duee
  • Berno Hellauer
  • Max Mueller
  • Andreas Rembold
  • Aurelio Schug
  • Abbas Seifeddine
  • Moritz Schneider
  • Kevin Weber
  • Sebastian Westphal
table of contents
1 - Aims of the project

2 - What we did in the project

3 - Installation Site Selection

4 - Power production assessment

5 - Environmental Review

6 - Interconnection Studies

7 - Financial Aspects

8 – Conclusion and Proposals

Table of contents
1 aims of the project
convince Russia to build offshore windfarms

basic planning of 115/130MW windfarm in Kaliningrad region

feasibility study

1 - Aims of the Project
2 what we did in the project
Collect information:

- technical

- legislative

- financial aspects

Basic planning and feasibilty calculation of offshore windfarms for Kaliningrad region

Conclusions and proposals

2 - What we did in the project
2 what we did in the project1
Our project includes:

Installation Site Selection

Power production assessment

Environmental Review

Interconnection Studies

Financial Aspects

2 - What we did in the project
4 power production assessment

P, kW

fy,i %

Annual wind speed m/s

Wind speed m/s

4 - Power production assessment
5 environmental review
5 - Environmental review

EIA and ecological assessment

  • EIA procedure promotes decision making on realization of planned activity taking into account:
  • possible adverse effects and environmental consequences;
  • public opinion;
  • working out measures of decreasing and prevention of effects

EIA is carried out in few steps.

1. Preliminary assessments for requirements specification development of EIA.

2. Requirements specification making.

3. EIA investigations.

4. Preparation of preliminary EIA.

5. Public discussions.

4 financial aspects
4 – Financial aspects

Pnom -

Ins. Cost -

Payback period –

slide15
Data

WF1

WF2

Pnom: 130 MW

n-ntur: 65

Van: 8.5 m/s

Ean: 562 GWh

Total cost: 225 Mio €

Paybackperiod:

In Rus: ca. 7 Years

In Ger: ca. 3 Years

Ins. costs: 1718 €/kW

  • Pnom: 115 MW
  • n-ntur: 58
  • Van: 9.2 m/s
  • Ean: 489 GWh
  • Total cost: 192 Mio €
  • Paybackperiod:
  • In Rus: ca. 8 Years
  • In Ger: ca. 3 Years
  • Ins. costs: 1717 €/kW
8 conclusions
8 – Conclusions
  • No offshore wind energy development program;
  • No standards for evaluation of environmental and other impacts;
  • No other guiding documents;
  • No stimulation for production of wind electricity;
  • No one-desk policy;
  • Favorable wind conditions;
  • Enough place in suitable depths
  • Minimum environmental conflicts
  • Economically feasible
  • Growing interest by investors
  • Possibilities for connection to the grid

Kaliningrad region has a good perspectives for offshore wind power development

8 proposals
Use the experience of EU to prepare normative documentation and standards.

Financial stimulation for green power in Russia.

Encoureging the local people to accept such projects.

Use the modern wind power technology

8 - Proposals