1 / 16

LEIR Controls : Gain of Experience for the Running-in of LHC

LEIR Controls : Gain of Experience for the Running-in of LHC. Marine Pace on behalf of AB/CO and LSA. Outline. LEIR Controls Background Challenges Gain of experience in view of LHC Conclusions. Background. Major constraints Use controls designed for the LHC

hawa
Download Presentation

LEIR Controls : Gain of Experience for the Running-in of LHC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LEIR Controls :Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA Marine Pace - AB/CO

  2. Outline LEIR Controls • Background • Challenges • Gain of experience in view of LHC • Conclusions Marine Pace - AB/CO

  3. Background • Major constraints • Use controls designed for the LHC • Apply unified controls from the merge PS and SL Controls Groups • Integrate legacy controls from existing PS accelerators • A test-bed for new standard solutions in view of LHC • Used for the first time under operational conditions • To be deployed in LHC & its pre-injectors at later stage • An anticipated challenge for the CO Group Marine Pace - AB/CO

  4. Challenges • Technical • Customize/enhance/generalize LHC controls • Were implemented for transfer lines • But LEIR is a circular + cooling + multi-cycling accelerator • Practically validate LHC controls • Deeper validation than TT40 & Ti8 • Deploy new unified controls from PS and SL • While respecting operational milestones • Tight schedule • Objective: provide a minimum set of functionalities & tools to operate the machine • Cultural • Define a unique strategy from historically different solutions and habits on both sides • Set-up productive developer teams • Convince Operations to understand new concepts and use new tools / methods Marine Pace - AB/CO

  5. SettingGene- App Legacy XMotif App Generic App WorkingSetsKnobs BeamSteerApp Consoles TRIM App Config DB LSA DB LSACore ApplicationServers Controls Middleware GM device FESA device Front End Snapshot of a hybrid controls system (not complete) Marine Pace - AB/CO

  6. Outline LEIR Controls • Background • Challenges • Gain of experience if view of LHC • Technical perspective • Cultural perspective • Conclusions Marine Pace - AB/CO

  7. where LEIR brought a significant experience Gain of experience in view of LHCTechnical Perspective • Controls for LHC deployed at LEIR • Front end Hardware • Front end Software • Application Software • Analogue Signal Observation System • Sequencing and Timing - CBCM • Alarms – LASER • Common Console Manager - CCM • Device Access interface – JAPC • Controls Middleware – CMW • …. Marine Pace - AB/CO

  8. Front End Hardware • Front end VME machines • LHC standard technology • Wiener Crates hosting CES PowerPC RIO2/3 processor • Experience • Minor problem solved • Worked well during operation from the start • Timing Receiver Module - CTR • Designed for the LHC, deployed at LEIR • Experience • In-depth validation of main functionalities • Worked well during operation from the start  Very smooth integration of LHC HW components Marine Pace - AB/CO

  9. Front End Software • Front-End Software Architecture - FESA • New framework for real-time device software development • Widely used at LEIR: BT, BDI, RF, TIMING devices • Experience • LEIR too early for FESA - Missing commissioning time • Lack of stability and maturity (for a significant part of the commissioning) • Late delivery of some important features • Releasing process not fully mastered • Main functionalities now in place and validated • Major progress compared to old FE software framework • Proven to be efficient + adequate • Stringent software release policy decided  Essential for CO that it was tested in LEIR Marine Pace - AB/CO

  10. LHC Software Application – LSA • Settings Management • Challenging cycle definition • Cycle to USER mapping: many USERs, multi-USER cycle • Varying optics in cycles • Cycle in terms of Brho-dot • Complex parameter space • Eddy Current Compensation • Electron Cooler Compensation • Trim • Challenging requirements • Brho-dot, Brho trims • Plus incorporation with cycle. • Plus propagation across USERs • Orbit • Full integration of LSA core components • Drive, Trim, Optics,… Marine Pace - AB/CO

  11. LHC Software Application – LSA (cont’d) • Experience • Design proven powerful • Data model, 3 tier architecture, core functionality • Adaptation to LEIR relatively easy • Extremely valuable validation • Lot of debugging and concept straightening performed • Adaptation made LSA more complete and versatile  An important milestone towards LHC controls Marine Pace - AB/CO

  12. Generic Application Software – Working Sets / Knobs • Widely used at LEIR • Java re-write of legacy generic applications • Lower-level controls of individual parameters • Experience • Main functionalities are now in place • Helped improvement of Middleware and FESA • No specification for LHC yet but … • Might be an interesting candidate for machine development Fast setting-up of controls environment for a new device • Will be used for CNGS, CESAR, SPS RF timing,… Marine Pace - AB/CO

  13. Analogue Signal Observation System OASIS • Designed for all CERN machines, deployed at LEIR • Experience • Significant validation • Scalability (partially) proven ~ 200 signals • Software architecture (3 tier) well suited • Good performance of FESA server and Application server • New Acqiris oscilloscope modules validated • Lots of issues solved during commissioning • Main functionalities in place now • Solution underway for slowness of GLOBAL SIGNAL connections  In-depth validation performed in view of LHC Marine Pace - AB/CO

  14. What we learnt Cultural Perspective • Cultural difference PS-SPS was a real challenge • Controls providers: extra effort & time to overcome cultural differences • LEIR Operators from a unique culture – PS • LEIR OP would have preferred traditional PS-style controls to be deployed • NO LEIR operator participatedin the applications development • Experience • Context was not favorable to a mass deployment of new / LHC controls • Closer collaboration CO  LEIR OP in the SW development projects would have helped • But also a great opportunity • Cross pollination between PS and SPS approaches • Fruitful experience for all people who actively participated in the specification, design and development Marine Pace - AB/CO

  15. What we did NOT learn • LEIR is a small machine • Scalability of SW architecture and core components NOT validated • Might be an issue. Need of a full scale validation. • LEIR is a harmless machine • Critical systems for LHC NOT validated • Power and Beam interlocks • Real Time feedbacks • Quench protection • Cryogenics • Collimation … • And related services: post mortem, logging….. • NO experience in Unified Industrial Controls UNICOS Marine Pace - AB/CO

  16. Conclusion • The starting point • LEIR OP and CO had different goals for LEIR • OP wanted to commission LEIR with 100% functional and reliable controls • CO and LSA team used LEIR as a test bed for LHC software • The outcome • Controls made work more difficult for LEIR-OP • But it did not prevent them from operating the machine • A “Not perfect but operational” controls system is available • From CO viewpoint we achieved an important milestone towards LHC Marine Pace - AB/CO

More Related