30 likes | 235 Views
TECs integration infrastructure. 8.1m. 2m. 7m. 8m. Storage. Storage. As. Petal storage. Se. Se. 2m. As. As. Petal insertion. Petal insertion. 2m. TEC-. TEC+. LT. LT/Re. TEC. CP/DA/Fr Ly/Lo. CP Aa. Cold Room. 3m. 4m. Plateform. 4m. TIF.
E N D
TECs integration infrastructure 8.1m 2m 7m 8m Storage Storage As Petal storage Se Se 2m As As Petal insertion Petal insertion 2m TEC- TEC+ LT LT/Re TEC CP/DA/Fr Ly/Lo CP Aa Cold Room 3m 4m Plateform 4m TIF • - Se : all services for 2 sectors (LIC cables, Ericson multi-ribbons, cooling (0-15°), pressurised air) • As : Petal’s assembly tables • LT : 4 petals Long Term • LT/Re : 4 petals Reception and/or LT • CP Aa : Aachen cooling plant • CP/DA/Fr : Cooling plant + Dry air + Fridge LT benches
Space : PICs and TEC- in clean room • check space to move TIB and TEC- to Tracker Tube • check TEC craddle operation inside clean room (crane-hatch) • Cold room : date when space, plateform for services, power supply available, • open question : distance and floor height difference to TIF • Services : • - At TIF corner for cold room and PIC • - 2 sectors plus 8 LT petals • 96 LICs (2 types analog) + 18 LICs (control) + 12 LICs (1 type analog) + 4 • LICs (control) + 6 LICs (2 types analog) + 2 LICs ( spare control) • TOTAL : 120 LICs (2 types analog) + 24 LICs (control) • - Ericson multi-ribbons : 30 + 8 (including 2 spares) • - Cooling (>15°) • - presurised (dry ?) air • - At TIF center between TEC- and TEC+ • - 2 sectors plus 8 LT petals • 96 LICs (2 types analog) + 18 LICs (control) + 12 LICs (1 type analog) + 4 • LICs (control) + 6 LICs (2 types analog) + 2 LICs ( spare control) • TOTAL : 120 LICs (2 types analog) + 24 LICs (control) • - Ericson multi-ribbons : 30 (including 2 spares) • - Cooling (>15°) • - presurised (dry ?) air • check position and installation of cables for bottom test (interference with craddle horizontal rotation) TECs integration : open questions