MPSB: 2GEV project. TE-EPC Group Meeting 26 of June 2009. Jean-Paul Burnet. MPSB: Actual configuration. Main problems: Not enough voltage due to 5% tolerance on network and commutation voltage drop Input transformer Irms above the limit of 1882A (2300A)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'MPSB: 2GEV project' - halona


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
mpsb 2gev project

MPSB: 2GEV project

TE-EPC Group Meeting 26 of June 2009

Jean-Paul Burnet

slide2

MPSB: Actual configuration

  • Main problems:
  • Not enough voltage due to 5% tolerance on network and commutation voltage drop
  • Input transformer Irms above the limit of 1882A (2300A)
  • 18kV power quality already critical. Increase in power pulses will lead to unacceptable voltage fluctuations
slide3

MPSB: Actual configuration

Alfa is fully opened but still the current does not rump-up as wanted

  • 2 Gev pulse

Irms (1.2s) = 2300A

Irms (1.2s) = 1700A

  • 1.4 Gev pulse

Power pulse increase

slide4

MPSB: New main power supply

  • 3 container 0.25F as in POPS needed:
  • Nmode: Ecap=3*0.5*0.25*(4500^2-3000^2)=4.2MJ
  • Dmode: Ecap=2*0.5*0.25*(5000^2-3000^2)=4MJ

3 transformers 2500MVA and 3 rectifiers as those used in POPS needed

  • 12.5 MCHF Electrical part
  • 2.0 MCHF Infrastructure
slide5

MPSB: New main power supply

  • To verify:
  • A considerable increase of power is needed from the grid. Need to check if this is possible
  • Irms in the magnet also increase. Thermal problems?
  • One big problem is the high magnet resistivity that asks for high input power. Is it possible to think of replacing the magnets with less resistive one?
      • -30% resistance means 2 MW less, 1 transformer+AFE less, 20MCHF electricity saving over 10years.