Airtightness Activities at SP & expectations with a EU network. Eva Sikander, SP Technical Research Institute of Sweden. Activities at SP Airtightness during the building process. Requiremets – new buildings , reconstruction Guidance to developers Following up

hallie
Download Presentation

Airtightness Activities at SP & expectations with a EU network

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AirtightnessActivities at SP & expectations with a EU network Eva Sikander, SP Technical Research Institute of Sweden

  2. Activities at SP Airtightness during the building process Requiremets – new buildings, reconstruction Guidancetodevelopers Followingup Measuremets – airtightnessof the wholebuildingenvelope - airtightnessof a part of the building EN13829 Havealsotested CAN/CGSB-149.15 (using the ventilationsystem) Training Designers and contractors (craftsmen) – often in connectiontoveryenergyefficientbuildings Research – example • Durability / in field • Durability / laboratory – ongoing • Easytobuildairtight? Choiseofstructurestoachieveairtightenvelopes in a moreeasyway – massive or lightveightenvelopes?

  3. A method to ensure airtightness of the building envelope : ByggaL (www.lufttathet.se) Early planning Design Construction Operation Covers the whole building process Require-ments Airtightnessrequirements and the developersown work L • Routines • Checklists • Developer • Designer • Contractor • Operator Designing for airtightness Detailed drawings and descriptions L Documen-tation Critical details Measuremnts L Operation for sustainableairtightness L

  4. Activities at SP Airtightness of components – in laboratory (not completed) Windows, doors, wallstructures, materials etc • ENxxx - • Etc Ventilation duct systems (at the manufacturers site) • EN12237 (circular) • EN1507 (rectangular) Components in ventilation system • EN1751 (spjäll and duct) • EN13180 (flexible ducts) • Etc

  5. Expectations with a EU network General: Exchange ofexperiences • Competent tester schemes • Input to testers training • Databasedevelopment • Developmentofrequirements • Strategieswhen it comestobigbuildings or testing a part of a building

  6. Situation in Sweden Swedish BuildingCode • Requirementsconcerningenergyuse, no specificrequirementsconcerningairtightness. • The developer has the responsibilitytofulfiltheserequirements The developerhavecontractswith different actorsto make sure thattheserequirements or evenmorespecific and demandingrequirementsarefulfilled. The buildingindustry (developers/designers/contractors) have a increasingawarenessabout the importanceofairtightbuildingenvelopes!