1 / 36

What It’s All About

Multimodal Integrated Corridor Management. What It’s All About. More Than CSMPs. Overview. CSMP Background – How We Got Here CSMP Status – Where We Are The Challenge Ahead – What It Takes To Get Where We Need To Be. GM’s FUTURAMA Stretching the Horizon. 42 Mile Loop. 1971.

halil
Download Presentation

What It’s All About

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Multimodal Integrated Corridor Management What It’s All About

  2. More Than CSMPs

  3. Overview • CSMP Background – How We Got Here • CSMP Status – Where We Are • The Challenge Ahead – What It Takes To Get Where We Need To Be

  4. GM’s FUTURAMA Stretching the Horizon

  5. 42 Mile Loop

  6. 1971

  7. 1971 (42 Miles) 1998 (750 Miles) Los Angeles District 7 TMC

  8. District 7 New TMC

  9. Beware CSMPs Ahead

  10. AASHTO Summits • Conducted congestion summits in cooperation with the four regional AASHTO meetings. • Identified innovative strategies and initiatives that states were adopting for dealing with the congestion challenge • To learn from one another about what was possible, and how state DOT leadership could make a difference in improving transportation system performance

  11. Summit Themes • There is no Single Solution • Performance Measurement is a Key to Overcoming Limited Resources • The Extent of the Congestion Challenge Goes Beyond One Jurisdiction’s Boundaries and Requires Collaboration

  12. Performance Poetry • How can you manage if you don’t know what’s happening • How can you show people what to invest in if they can’t visualize that return on investment • How do you challenge people to improve without a vision

  13. Background CSMPs – High Octane System Planning Caltrans – The Mobility Company New Tools – Performance, Simulation, and more

  14. Critical Themes All Jurisdictions All Modes Performance Commitment Plan Corridor Management Plans CMP

  15. Corridor Description Performance Assessment Corridor Team Understanding Analytics Improvements Proposal Plan Components Ongoing

  16. Reliability Safety Mobility Productivity Modern Metrics Performance

  17. Arterial network • 40 miles of arterials • Approximately 250 signalized intersections • 12 major connectors to I-880 Freeway • Traffic signals controlled and maintained by respective local agencies • Different signal control systems

  18. Development Milestones Corridor definition Stakeholder team Preliminary performance assessment Detection in place Comprehensive performance assessment Identify causes of congestion Test improvement scenarios Prioritize recommendations

  19. CSMP Status • 26 Corridors Underway • 7 Detection Projects Moving • Primitive Stage • January Meeting to Determine Future Direction

  20. The Challenge • What are we really going to do • When • Concept of Operations • Managing Across Modes, Jurisdictions & Strategies

  21. What Does It Mean To Manage • Building a House vs Managing a Home • Integrate vs Co-ordinate • Soviet Collectives Revisited

  22. More Active Management

More Related