1 / 14

“New Objects in Sochi”

“New Objects in Sochi”. Подготовил ученик 8 класса МКОУСОШ №8 Острожный Артём. Construction of the Olympic mountain village in the ski resort "Rose Farm" will be completed in September 2013. Mountain Olympic village will be build at an altitude of 1100 m above sea level.

hachi
Download Presentation

“New Objects in Sochi”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “New Objects in Sochi” Подготовил ученик 8 класса МКОУСОШ №8 Острожный Артём

  2. Construction of the Olympic mountain village in the ski resort "Rose Farm" will be completed in September 2013. Mountain Olympic village will be build at an altitude of 1100 m above sea level.  Construction of the lower zone of the resort is expected to be completed by the beginning of the winter season, which is scheduled for December 22. It managed by international operators will open three hotels.

  3. Sochi Winter Palace of Sports "Iceberg" will be put into operation on November 25. Object intended for figure skating and short-track.

  4. Center Luge "Sledge" - the bobsleigh track, located in the ski resort "Alpika-Service" to the finish area in the tract "rye field." Construction of the road was completed in 2012. The track is located 60 kilometers north-east of Sochi. It will host bobsleigh, skeleton and luge in the Winter Olympic Games in 2014. Advanced technology training ice provide accurate and constant temperature control run. After the Olympics, the object to be used as a national training center.

  5. Ice Palace complex "Big" for 12 000 spectators - a single building, covered with a spherical dome. The concept of the image of the scene laid frozen drop. The dominant color of the dome cover is silver . After the Games Ice Palace "Big" will be ultra-modern multi-purpose sports and entertainment facilities of world level.

  6. The stadium is designed for 40,000 spectators. "The stadium has a great concept of the Winter Games, as well as a stable long-term project for Sochi. Its shape resembles the coastal part of the city and the mountainous background, his transparent shiny coating like clear skies.

  7. In Adler is building of the new Olympic passenger rail terminal. Construction of the station is in preparation for transport infrastructure for the Olympic Winter Games in Sochi in 2014. Commissioning of the new terminal is scheduled at the end of 2012. It will bring together all types of public transport - rail, road, air and sea

  8. And so a new Olympic terminal promises to appear before our eyes in a few months ... The new station was built in a form resembling a sea wave. By the way, it was built in the Black Sea

  9. Main Media Centre (press, television station), includes buildings and facilities to accommodate the media during the Olympic Games in 2014.

  10. Curling Arena is located in the coastal cluster in the grounds of the Olympic Park. The design of the ice arena for curling laconic. It is read by democratic, accessible and at the same time conviviality, characteristic for the Olympic and Paralympic Games. Olympic Curling - the object of collapsible type can be dismantled for transport and construction for post-Olympic use as an ice rink for curling in a different city of the Russian Federation.

  11. Coastal water park project in conjunction with the Olympic ice arena and Curling Arena.

  12. Sports facilities being built for the Olympics will be used in the future for our children.

More Related