MEG DC (report June 04)

DC report june_04,J.E. MEG DC (report June 04). Foil stability and quench related problems How to get more stability Frame design Measurement of the m target position schedule 2004-2005. DC report june_04,J.E. Y O. X L. Y O ,X R +X L. X L , X R. X R. p DC. p bag. Sbag1. Sbag2.

gzifa
Download Presentation

MEG DC (report June 04)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DC report june_04,J.E. MEG DC (report June04) • Foil stability and quench related problems • How to get more stability • Frame design • Measurement of the m target position • schedule 2004-2005

  2. DC report june_04,J.E. YO XL YO,XR +XL XL,XR XR pDC pbag Sbag1 Sbag2 Bag gas DC gas Pbag,PDC Pbag-PDC bubbler Vbubbler Hood foil stability test • a) .1 mm not reached at flux changes • b) V-bubbler successful • c) XR,XL,YO correlated • Larger forces on the foil • „vertical forces“, stabilize chamber width

  3. DC report june_04,J.E. • Larger forces on the frame  larger deformations • How to get „vertical forces“ • Control of the HV to avoid damages during quench • Quench is relatively slow : t > > 1 sec • To fast switch off (chamber HV) is also dangerous : RC(chamber) ~ 10 ms •  switch off time ~ 100 ms We think about ways to test the behavior to quenches, as soon as the Al-frame full size prototype will be completely available

  4. Mounting of Cathode foils DC report june_04,J.E. a) Stretchedcarbon fibers(1000x d=6mm) and deformedROHACELL Pretension forceson frameto simulate carbon fibers and foils, glue fibers b) Position (.1 mm)stretched foils and glue them on frame and ROHACELL c) Cut foil  vertical miniforce on the foil Also z-stability better (^ S 1/expansion coef)

  5. DC report june_04,J.E. Mounting of Hood foil • To do better: Stretch „vertically“ and fix the width • Modify the shape of the hood to have a larger flat surface to glue • Machine a foam structure in ROHACELL 30 • Adapt the cathode foil procedureOnly minor modifications to the previously designed tools Largest height Not disturbing the cell

  6. DC report june_04,J.E. wings basis Carbon fibers 110 mm Stesalit 199 mm 331 mm Frame shape • fix dimensions of foils  order • Only wing print + built in LV supply cable • carbon fibers solution (W) and price • modify frame shape to correct in first order for: • basis shape ( first cell) frame height (foil height) edge angle (gluing) tested

  7. DC report june_04,J.E. m target position • Without knowing the exact spectrometer resolution build a target with holes of different sizes • Knowing the exact spectrometer resolution optimize the size of a series of holes and slits on the target to clearly see the holes without loosing too much intensitiesSince the non stopped m seem to have a larger probability to contribute to the background, the edge of the target will not be sharp enough .

  8. Drift Chamber 2002 2003 2004 2005 Full Prototype Beam test Medium Prototype Charge division & Cosmics Full Prototype Full Detector (18 DC) Medium Prototype Charge division & Cosmics COBRA inside Full Size Prototype outside Inside COBRA Full Prototype Full Detector (18 DC) Design Manufacturing Assembly Test Milestone

  9. DC report june_04,J.E. Drift Chamber 2004 2005 Feb Mar Apr Mai Jun jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Mai Jun Jul Aug 1 29 30 Foil Preamp cable 30 Simul,design Mod tools 1 frames Print anode 1 tests Other Prints 1 Full Size Prototype,Al Tests anode Beam,quench COBRA beam outside inside Inside COBRA Full prototype Inside COBRA Full Detector (18 DC) support calibration cosmics Design Manufacturing Assembly Test Order Delivery Milestone