CTF3 Update R. Corsini for the CTF3 Team. 1. Run 1 – fast update. Consolidated factor 8 combination Routinely operating with factor 8 this year, 28 A Huge progress in reliability (3 TWTs , klystrons) – stability – r epeatibility

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'CTF3 Update R. Corsini for the CTF3 Team' - gzifa


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide2

Run 1 – fast update

  • Consolidated factor 8 combination
    • Routinely operating with factor 8 this year, 28 A
    • Huge progress in reliability (3 TWTs, klystrons) – stability – repeatibility
    • Still working on dispersion control, emittance, transport to CLEX
  • TBTS
    • Nominal field level, large reserve in power
    • Wake-field monitor tests ongoing (renewed system)
    • Studies on multipolar RF fields, BD kicks, beam coupling studies, flash-box (Uppsala)
  • TBL
    • Not a lot of beam-time (vacuum leaks), some problem with high-current transport
  • CALIFES experiments:
    • Electro-Optical bunch length monitor, excellent first results!
    • BLM studies (diamond detector) started, continuation of BPMs…
  • Phase feed forward
    • Preparatory studies very successful (TL2 optics, bump closure, phase measurements…)
slide3

Outlook

  • Still one week of operation
  • Window for Two-Beam Module installation: 23rdJune - 22ndSeptember(tight but…)
  • MDKs maintenance and other repairs/upgrades in the shadow of the module
  • PHIN run from 28thJuly
  • Beam-loading dog-leg experiment
    • RF conditioning from beginning of 7th July
    • Beam testing from mid August
  • DB preparation from 1st September (up to tail-clipper dump)
  • Phase feed forward
    • Amplifiers at CERN next week… high priority at restart
  • TBL
    • New PETS tank installed
    • High priority, work on high current transport
  • TBTS ongoing activities to be continued and extended with the TBM –
  • CALIFES experiments also to be continued
slide5

Beam quality:

Horizontal emittance:

CR combination 8, end of TBL line in CLEX ~ 400 um

Vertical emittance:CR combination 8, end of TBL line in CLEX ~ 140 um (target 150 um)

Stability:

Routinely < 5 10-4 from linac

About 5 10-3 CR combination 8

Losses: < 10% CR combination factor 8

Repeatibility:

Blue line: CR combination on 29 April, evening

Red line: CR combination at start-up (no adjustments done) on 30 April

slide6

Linac

Delay Loop

1st turn

Combiner Ring

Status – 28 A in CR (factor 8)

4th turn

slide8

Status – transport to CLEX,

~ 28 A before the wall (factor 8)

slide9

Run 1 – summary until now

30 Jan first beam from gun

17 Feb first beam in spectrometer 10 (3 GHz)

18 Feb first 3 GHz beam in CR, first 1.5 GHz beam in linac

19 Feb first CALIFES beam

21 Feb first 1.5 GHz beam to CR

24 Feb first combination 4 beam (1.5 GHz with phase switches)

26 Feb 14 A (factor 4) extracted from CR

27 Feb first beam in CLEX (uncombined)

4 Mar first beam (3 GHz) to – and through – DL

5 Mar full combination factor 2 in DL (7 A)

13 Mar beam (uncombined) end of TBL / 3 GHz factor 4 optimized, 16 A

19 Mar first drive beam to TBTS for Uppsala beam tests (factors 1 to 4)

21 Mar first factor 8 recombination ~ 20 A

25 Mar good factor 8, ~ 25 A ~1% stability

9 Apr drive beam transport to TBTS, > 20 A

10 Apr two-beam acceleration, ~ nominal CLIC gradient 100 MV/m

14 Apr New TL2 optics for phase feed-forward commissioned, phase slow correction tested

16 Apr drive beam transport to CLEX > 23 A (TBL > 20 A)

slide10

CTF3 Schedule 2014

Installation TBM / Maintenance klystrons

slide11

TBM Installation

D. Gudkov, G. Riddone, H. Mainaud …