1 / 10

BL13 — XALOC

Guifré Cuní on behalf of the XALOC team. BL13 — XALOC. ALBA. warehouse. offices. Tech. building. Synchrotron light in Booster: Jan 2010. 2.7 GeV with 0.7 mA: 22 Jan 2010. Status of XALOC at September 2010. Optics almost all completed End-station under installation

gwen
Download Presentation

BL13 — XALOC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Guifré Cuní on behalf of the XALOC team BL13 — XALOC

  2. ALBA warehouse offices Tech. building

  3. Synchrotron light in Booster: Jan 2010

  4. 2.7 GeV with 0.7 mA: 22 Jan 2010

  5. Status of XALOC at September 2010 • Optics almost all completed • End-station under installation • Commissioning with beam just after installing undulator

  6. XALOC optics layout XBPMs Ring Monochromator Vert. Foc. Mirror (VFM) Hor. Foc. Mirror (HFM)

  7. Procurement End-Station in-house commercial mixed Beam condit. el’s Status: Designing Diffractometer Status: To be integrated Diffractometer table Status: Motor tests Sample changer Status: To be commiss. Detector table Status: Design finished Detector Status: Awarded

  8. End-Station: diffractometer • MD2M First mini-diffractometer out of ESRF Full metrology done Received and tested To be integrated into the BL control Viewing system • on-axis • software available XYZ movable beamstop • In-house design Not included in the contract Mini-kappa • Removable • sphere of confusion ~5m Omega axis • air bearing • run-out 1 m, accuracy < 1 mdeg

  9. End Station: Automatic sample changer Flexible 6-axis arm automatically exchangeable gripper

  10. Controls • CATS with Custom I/O signals • 3 regions: Free, 1, 2 • SW allow MOVE/PIN/PLATE • Cryostream: • 3 positions IN, OUT, FAR • Motion: SW / Icepap • Security: PLC • Omega: ETEL/Icepap's slave + metrology • Monitoring + batch for operating CATS

More Related