charm update n.
Download
Skip this Video
Download Presentation
CHARM Update

Loading in 2 Seconds...

play fullscreen
1 / 13

CHARM Update - PowerPoint PPT Presentation


  • 106 Views
  • Uploaded on

CHARM Update. J. Mekki. CHARM Update. Goal of the facility : Complex mixed particle field present within the accelerators Simultaneous effect (TID, DD, SEE )

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'CHARM Update' - gusty


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
charm update
CHARM Update

J. Mekki

charm update1
CHARM Update
  • Goal of the facility:
    • Complexmixed particlefieldpresentwithin the accelerators
    • Simultaneouseffect (TID, DD, SEE)
    • In the framework of the R2E project the testing of electronicequipment in a radiation fieldsimilar to CERN acceleratorsis crucial → Assure mid-long termoperationrequirements
    • Facility not onlyuseful for CERN accelerators but also for :
      • Groundlevel and atmosphericenvironment(neutron energyspectra)
      • Spaceenvironment(representative for the inner proton radiation belt)
    • Size of the test area (severaltens of m3):
      • Large objectscanbeirradiated
      • Evenobjects in operationwith services connected (power, cooling…)
      • Can also host satelittes, part of cars or planes.
slide3

East Area Facilities

24 GeV/c proton beam

slide4

East Area Facilities

24 GeV/c proton beam

IRRAD proton facility

PH/DT

24 GeV/c proton beam

LHC experiments

slide5

East Area Facilities

24 GeV/c proton beam

CHARM

R2E Project

slide6

East Area Facilities

24 GeV/c proton beam

Technical local

Connection to the radiation area

slide7

East Area Facilities

24 GeV/c proton beam

Control room

Dry run test

slide8

East Area Facilities

24 GeV/c proton beam

Platform for the Dry Run test of

heavy equipment e. g. UPS, Power converters

slide9

CHARM

24 GeV/c proton beam

slide10

Montrac conveyer

  • Implementation
    • Hypertack
    • 6 NE48 (RadTOL)
slide11

News

  • Schedule:
    • We are on the way → around 2 monthsbeforegetting first beam → Everypieces/blocks/systems of CHARM are building/mountingeachday.
    • Commissioningshouldstart in August.
    • OperationshouldstartduringSeptember up to the 8th of December.
  • In order to prepare the CHARM operationschedule, the beam time requestform has been sent to the RadWGlist and externalusers.
  • For the moment someusers (alsoexternal) showedinterest of suchfacility (e. g. BNL, LHC experiments etc…)
  • FromRadWG, I have not yetreceivedanyfilledform.
  • Anycommentsregarding the beam time requestform ?
  • Information:
    • The new websiteisavailableherehttp://charm.web.cern.ch/CHARM/
    • You canalsofind information about the availablecables on-site. http://charm.web.cern.ch/CHARM/Cables.php
slide13

Varying Radiation Field

Beam Positiontarget in:HEH: >1011cm-2h-1TID: >100 Gyh-1

target out:HEH: >1013cm-2h-1TID: >10 kGyh-1

Beam Pos.

Longitudinal

Lateral Positions

HEH: 108cm-2h-1 – 1011cm-2h-1TID: 0.1Gyh-1 – 100Gyh-1

(gradients to be considered)

Full racks, crates, set of cards, componentsHEH: 107cm-2h-1 – 1010cm-2h-1, TID: 10mGyh-1 – 10Gyh-1