ORNL Commissioning Experiences. Missy Ogan. AMCL - Details. Will house world’s current most sensitive microscope! No Electromagnetic fields close by. User wanted minimal metals in building. Very low air flows – during microscope operation. Design-Bid-Build method. AMCL – Commissioning.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'ORNL Commissioning Experiences' - gretel


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
amcl details
AMCL - Details
  • Will house world’s current most sensitive microscope!
  • No Electromagnetic fields close by.
  • User wanted minimal metals in building.
  • Very low air flows – during microscope operation.
  • Design-Bid-Build method
amcl commissioning
AMCL – Commissioning
  • CX was brought in by AE too late in design process ~90%
  • Lots of engineering hold points to measure and verify rebar placement.
  • Lots of measurements to verify HVAC performance in Instrument room.
  • Reqd final measurements to verify Electromagnetic fields.
slide4
AMCL
  • Construction bids were way over budget.
    • Contractor unfamiliar with CX term. $$ to cover
    • Many other factors went into $$$ (DDC, Arch design)
  • Currently redesigning with GMP approach and Contractor on board.
  • CX in-house
  • No Hold points
  • No testing of electromagnetic fields as part of project
  • No special air flow tests.
private sector bldg commissioning
Private Sector Bldg - Commissioning
  • Developer got CX on board way too late in design.
  • Cancelled Developer CX contract after first meeting – ORNL contracted for CX.
    • ORNL has VERY limited engineering staff
    • Building ~ 150,000 nusf
  • ORNL CX doing great job!
  • CX also assisting project team with LEED documentation.
joint institute for computer science
Joint Institute for Computer Science
  • State bldg
  • ORNL provided CX from beginning of design (same CX as on Private Sector).
  • ORNL cancelled LEED LAP contract at ~ 60% and gave to CX.
  • Construction under way and all is going good.
mouse house commissioning
Mouse House -Commissioning
  • Design-Build – complicated HVAC system
  • CX on board late.
  • Draft of CX plan rejected.
  • CX details coming together with our guidance.
cx general
CX General
  • MASTERSPEC – new sections (have not used)
    • 01810 General Commissioning Requirements
    • 01815 HVAC Commissioning Requirements
  • Has helped to augment our Engineering staff especially during construction.
  • Proved beneficial for CX to assist with LEED.