An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 信息化建设进展汇报 2014年9月22日星期一

  2. 煤炭营销系统进展 12月完成情况: • 完成了除结算模块外所有模块的开发完成。 • 完成了关键用户的系统培训工作。 • 2011年12月30日举行了煤炭营销系统的试上线大会。 1月工作重点: • 计划完成结算模块的开发工作。 • 计划用2012年的新数据对关键用户进行第二次系统培训工作。 • 注:对OA系统的销售审批流程信息中心将于周末进行关闭。

  3. 12月完成情况: 完成了新门户系统所有数据的导入功能。 1月工作重点: 计划定于1月13日再次对新门户系统进行迁移并试上线。 门户系统进展

  4. 卡车调度系统工作进展 12月完成情况 • 由于技术原因,日立液压正铲的接口数据没能如期调试完毕。 1月工作重点 • 计划完成日立液压正铲的接口测试工作。

  5. 其他工作进展 12月完成情况 • 现公司计划经营办公室负责各计划与指标的研讨,数据中心最终建设方案决定等计划经营办完成各个指标的梳理后再按梳理结果分部进行开发工作。 • 与公司领导一同调研了首钢矿业公司的国产卡调系统,现与首钢沟通,如果技术可行、先进的话考虑对现有卡调系统进行改良。 1月工作重点 • 计划完成2012年信息化建设方案。

  6. 谢 谢 !