html5-img
1 / 30

EoI 2003

EoI 2003. EoI Report Upload process DEMv7. EoI 2003 : EoI report. Status Use of DEM Transmission. EoI Report : Status. 28 countries reported 2 more countries expected Oct.1st : 75 % received. EoI Report : Use of DEM. DEM reports: 85 % (EMEP: 4 MS). Problems using DEM:

greg
Download Presentation

EoI 2003

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EoI 2003 • EoI Report • Upload process • DEMv7 8th EIONET Workshop AQ,Oslo

  2. EoI 2003 : EoI report • Status • Use of DEM • Transmission 8th EIONET Workshop AQ,Oslo

  3. EoI Report : Status • 28 countries reported • 2 more countries expected • Oct.1st : 75 % received 8th EIONET Workshop AQ,Oslo

  4. EoI Report : Use of DEM • DEM reports: 85 % (EMEP: 4 MS) • Problems using DEM: • adding/modifying meta information • adding results of new measurements • ... • Reasons not using DEM: • problems using DEM • lack of time 8th EIONET Workshop AQ,Oslo

  5. EoI Report : Transmission • ETC ftp-site • CD • ReportNet/CDR 8th EIONET Workshop AQ,Oslo

  6. EoI 2003 : Upload process • Procedure • Report checks • Communication • Time schedule 8th EIONET Workshop AQ,Oslo

  7. Upload process: Procedure • Report/quality checks • Upload DEM into AirBase • Report results checks to Member States • Process reply Member States • Preparing for Report 8th EIONET Workshop AQ,Oslo

  8. Upload process: Report checks • Re-submitted raw data • Deleted meta data • Missing essential meta data • Outliers 8th EIONET Workshop AQ,Oslo

  9. Upload process: Report checks • Re-submitted data (general report) 8th EIONET Workshop AQ,Oslo

  10. Upload process: Report checks • Re-submitted data (detail report) 8th EIONET Workshop AQ,Oslo

  11. Upload process: Report checks • Deleted meta data (stations) 8th EIONET Workshop AQ,Oslo

  12. Upload process: Report checks • Deleted meta data (measurements) 8th EIONET Workshop AQ,Oslo

  13. Upload process: Report checks • Missing essential meta data 8th EIONET Workshop AQ,Oslo

  14. Upload process: Report checks • Outliers (general report) 8th EIONET Workshop AQ,Oslo

  15. Upload process: Report checks • Outliers (detail report) 8th EIONET Workshop AQ,Oslo

  16. Upload process: Communication • Status upload EoI 2003 on website • reply results upload reports: • re-submission raw data -> confirmation • outliers -> re-submission • deleted meta data with data stored in AirBase -> confirmation • missing essential meta data -> updated DEM • Technical/AQ report 2002 8th EIONET Workshop AQ,Oslo

  17. Upload process: Time schedule 8th EIONET Workshop AQ,Oslo

  18. EoI 2003 : DEMv7 • Integration with New Ozone Directive (2002/3/EC) dataflow • Integration with Reportnet (Upload to CDR) • Solving bugs and other problems in DEMv6 8th EIONET Workshop AQ,Oslo

  19. Data flows Ozone Directives 92/72/EEC and 2002/3/EC What Format old new monthly <1/n+2 ex1 ex1 summer 31/10 - ex 8, aot40, 1hmax annual 30/9 ex1/8/24 ex1/8, [stat], stat [prec], aot40 8th EIONET Workshop AQ,Oslo

  20. Experiences with Directive 92/72/EEC data flows Major problems: • Station meta information not complete • Linking info between files (which data belongs to which station) 8th EIONET Workshop AQ,Oslo

  21. Proposal • Spreadsheet based • Link between files based on EU station code • New stations: station sheet • Existing stations: meta info from AirBase • Annual data combining with EoI (DEM) 8th EIONET Workshop AQ,Oslo

  22. Sheets: • Exceedance sheet (monthly, summer, year) • Summer statistics • Annual statistics (aot40, [mean, percentiles, max]) • Precursor sheet [ann mean, percentiles, max] • Station sheet (new stations) [station info] 8th EIONET Workshop AQ,Oslo

  23. Sheets-import in DEM: • Only in the annual (30/9) delivery • Annual exceedance, statistics and precursor sheets can also be imported in DEMv7 • The annual statistics and precursor data can also be imported in DEM with standard DEM import formats • At the annual report new station information can be processed directly in the DEM. 8th EIONET Workshop AQ,Oslo

  24. Dataflows Sheet monthly Exceedance (Station) summer Exceedance (Station) Statistics annual Exceedance [Statistics] [DEM] [Precursor] [DEM] 8th EIONET Workshop AQ,Oslo

  25. AQ-DEM and ReportNet • Data Dictionary • AQ-DEM can support the development of a data dictionary format derived from the data model of Airbase according the requirements of the decisions and directives. • Indicator production • Air pollution indicators by using air quality data from Airbase • AQ-DEM • Supports dataflow from MS national database to European data warehouse's AirBase • QC on meta information (networks, stations, meas. Conf.) • QA/QC on measurement data • Legal basis • EoI decision • Ozone directive • EuroAirnet • EMEP/CCC • AQ reporting requirements, formats and guidances • Availability of data • Airbase (available via Internet (AirView)) • XML-dumps of complete AirBase on ETC/ACC-ftp • Factsheets • Meta-data in techn. report on national data reporting • Data flow • ETC-ACC receives AQ-DEM’s (MS Access mdb files) on CDrom or by FTP • The MS load the AQ-DEM also in the CDR 8th EIONET Workshop AQ,Oslo

  26. Transmitting data from EU-countries to Commission, EEA, ETC/ACC and EMEP/CCC • EoI/EuroAirnet (+ EMEP) data • CDROM to EU-Commission (Inform ETC/ACC and EEA) or: • CDROM to ETC/ACC (Inform EU-Commission and EEA) or: • Upload to EEA’s CDR (Inform EU-Commission and ETC/ACC) if CDR failed then: • Upload to ETC/ACC FTP (Inform EU-Commission And EEA) • Only EMEP data in DEM: • Upload to ETC/ACC FTP (Inform EMEP/CCC) 8th EIONET Workshop AQ,Oslo

  27. Transmitting data from non-EU-countries to EEA, ETC/ACC and EMEP/CCC • EoI/EuroAirnet (+ EMEP) data • CDROM to ETC/ACC (Inform EEA) or: • Upload to EEA’s CDR (Inform ETC/ACC) if CDR failed then: • Upload to ETC/ACC FTP (Inform EEA) • Only EMEP data in DEM: • Upload to ETC/ACC FTP (Inform EMEP/CCC) 8th EIONET Workshop AQ,Oslo

  28. Bugs Demv6 • It is not possible to add new measurement configurations and to modify existing measurement configurations ( NL, GR, BU, RO, SE ) • The station identification in the mark-file should be not only the station name but also the station code (DE) 8th EIONET Workshop AQ,Oslo

  29. Other problems (1) • The generation of the NASA Ames header file gives problems when importing EMEP-info by means of DEM-file (NL). When exporting the NASA Ames files the quality flags are not correct. • Comboboxes of the Station and Measurement configuration screens do not work properly. • The Meta Information, Measurement Configuration report does not work. • Visualisation of weekly and annual means is not ok. • Timing day samples can start at another time than 0:00 hour. (When importing the samples the time is default set at 0:00 hr) (NL) • Missing some components in the component list (iso-hexane, benzo(a)pyrene, nitrogen monoxide). Benzene in the main list. (UK, NL, AT). 8th EIONET Workshop AQ,Oslo

  30. Other problems (2) • When on a station a component is measured with two measurement methods, only one method is in the Mark-file (NL). • When a station is shut down during a year, this is not identified in the Mark-file (NL). • Some small problems with QA/QC module (NL). • Unable to enter 2-week benzene means since some of the data is 13, 14 or 15-day samples. (UK) • In the MeteoPar. tab also the possibility: “no meteo measured”. (NL). • The .mdb DEM-file can be very big: > 1 Gb. Add a warning and the access option “compact database” (=standard access tool) (UK, NL). • Problems with decimal symbol in the coordinates (AT). • Changing the manager info changes automatically the data supplier info (NL). 8th EIONET Workshop AQ,Oslo

More Related