Customized Product Costing and Estimation Process Overview

This document outlines the costing and estimation process for customized products, addressing both Maxi and Mini loops. The costing is anchored on sales inquiries generated by the sales force. The estimator verifies the Bill of Materials (BOM) and specifies the production technique. Based on this data, the material and overhead costs are calculated. The system recommends the optimum order quantity to minimize wastage and automatically adjusts the cost if this quantity is not met. It aims to streamline the ordering process and improve cost efficiency.

Download Presentation

Customized Product Costing and Estimation Process Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Brief Customized Product Maxi & Mini Loop Estimate Customized Products: Covers Blocks Costing & Estimate Customized Product Card Standard Products Customized Product Estimator Customized Products Overhead Feedback Overheads 4. Costing & Estimate 4.3.3.1/1

  2. Brief Customized Product Maxi & Mini Loop Estimate Process • The costing of the customized product is based on the sales enquiry which is generated by the sales force. • The estimator verifies the BOM and define the production technique. • On the basis of BOM and production technique the material cost and overhead cost is calculated. • The system advices the sales team for the optimum ordered quantity i.e. where the wastages are minimum. • The system automatically increases the cost if the optimum quantity is not ordered. 4. Costing & Estimate 4.3.3.1/2