MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week 5). MTA – Week3. MTA Weekly Report – Week 5. Shielding underneath hatch area is complete Restacking complete on 09/04 Finalizing some safety requirements:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'MTA – Week3' - grady-reyes


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

MTA beam line installation Weekly ReportSeptember 07, 2007Period covered:August 31st to September 7th (Week 5)

Shutdown’07 Week 5 F.G. Garcia

MTA – Week3

mta weekly report week 5
MTA Weekly Report – Week 5
  • Shielding underneath hatch area is complete
    • Restacking complete on 09/04
    • Finalizing some safety requirements:
      • Added cover plates to aid S&S
      • Retrofit cover plate over the utility penetration
      • Re-used the slug of concrete to plug in the beam pipe penetration
  • Electrical Work
    • Cable pull ongoing
      • Load cables estimate to finish by Monday
      • Immediately start pulling instrumentation cables

Next week: Continue with cable pull.

  • Mechanical Installation
    • All magnets have been stationed in place
      • Next step will be alignment!
    • Moving along with MW stands (45% complete).

Shutdown’07 Week 5 F.G. Garcia

mta weekly report week 51
MTA Weekly Report – Week 5
  • Alignment
    • Outside corner of the concrete blocks were shot by surveyors

Next week: Rough alignment starts Monday, Sep 10th

  • LCW work
    • Copper pipe installation complete (Linac side)
      • Brazing/installing taps

Next week: Contractors will be moving to the MTA side

  • Vacuum work
    • Making as much progress as possible with the assortment of the spool pieces and flanges
    • Ion pumps stands are complete
    • Beam pipe support stands are complete

Shutdown’07 Week 5 F.G. Garcia