How long does the ADU construction process take.

Plans and Engineering. The proposal is signed and the design process begins. We create a plan that fits your requirements and checks costs against your budgetary needs. 6-10 weeks.<br>

go15
Download Presentation

How long does the ADU construction process take.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How long does the ADU construction process take? Go ADU  • March 27, 2022 From signing the proposal to the delivery of a move-in-ready ADU, we’re usually looking at a turnaround time of 7-12 months. This roughly breaks down to: Plans and Engineering. The proposal is signed and the design process begins. We create a plan that fits your requirements and checks costs against your budgetary needs. 6-10 weeks. • Permitting. Submit the plans to the city and pull any necessary permits, working in tandem with the building department to expedite construction plans through the plan review process. 12-20 weeks. • Construction. Within a week of obtaining the required permits and approvals, we break ground. GoADU handles the entire process, from the initial checklist to the final approval of the delivered ADU. 14-18 weeks. • ADU's Made Simple ADU Contractor Los Angeles know more about Architectural Design Financing

More Related