slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
??????????????? ????????????? ????? PowerPoint Presentation
Download Presentation
??????????????? ????????????? ?????

Loading in 2 Seconds...

play fullscreen
1 / 7

??????????????? ????????????? ????? - PowerPoint PPT Presentation


  • 123 Views
  • Uploaded on

วิชาการเป็นเลิศ เชิดชูคุณธรรม ผู้นำ. Bunkering . วิชาการเป็นเลิศ เชิดชูคุณธรรม ผู้นำ. What is it?. Bunkering is the process of transferring fuel oil, sludge, diesel oil or cargo etc

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '??????????????? ????????????? ?????' - gizela


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
bunkering

Bunkering

Merchant Marine Training Centre

วิชาการเป็นเลิศเชิดชูคุณธรรม ผู้นำ

what is it
What is it?

Bunkering is the process of transferring fuel oil, sludge, diesel oil or cargo etc

Bunkering of fuel or diesel oil is very dangerous. The crew of the ship must be very careful to prevent any fire or oil spill

Merchant Marine Training Centre

วิชาการเป็นเลิศเชิดชูคุณธรรม ผู้นำ

checks to be made before bunkering
Checks to be made before bunkering
  • Which tanks are to be filled
  • Which tanks are to be filled first
  • Sounding is taken before bunkering
  • All deck scuppers plugged
  • Bunker line valve is closed
  • Take blanks off the bunker line
  • Anti pollution materials ready
  • Fire fighting equipment
  • The amount to be pumped is agreed
  • The pumping rate is agreed
  • There is ‘water on deck’
  • Check lists are signed by barge and ship
  • Joints are checked to make sure they are tight

Merchant Marine Training Centre

วิชาการเป็นเลิศเชิดชูคุณธรรม ผู้นำ

bunkering procedure
Bunkering Procedure
  • At the start of the bunker the pumping rate is low to check that the oil is coming to the correct tank
  • ŸDuring bunkering, sounding is taken regularly so they know the tank is filling correctly
  • Engineers will continually check all pipes and seals on the line to make sure there are no leaks
  • ŸSamples are taken during bunkering with the help of sampling cock at the manifold

Merchant Marine Training Centre

วิชาการเป็นเลิศเชิดชูคุณธรรม ผู้นำ

vocabulary
Vocabulary

Merchant Marine Training Centre

วิชาการเป็นเลิศเชิดชูคุณธรรม ผู้นำ

slide7
End

Merchant Marine Training Centre

วิชาการเป็นเลิศเชิดชูคุณธรรม ผู้นำ