An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ولقد خلقنا السماوات والأرض وما بينهما في ستة أيام وما مسنا من لغوب(سورة ق )

  2. King Fahd University of Petroleum and MineralsCollege of Environmental DesignDepartment of Construction Engineering and Management CEM:520:CONSTRUCTION CONTRACTING Term Paper Presentation FACTORS AFFECTING CONTRACTOR PERFORMANCE Presented to: Presented by: Dr. Saad Assaf Mohmead Fouad I.D. # 220432 Date: Dec. 2003

  3. Outline • Objective of the study • Study Limitations • Research Methodology • Survey Questionnaire • Results and Analysis • Study Conclusion • Recommendations

  4. Objective of the study • To explore the performance of the building construction contractors • Find out factors affecting their performance • Check the importance of each factor • To provide suggested solutions to high performance and quality

  5. Study Limitations • Building Construction Contractors only • Location of business in Jubail Industrial City • Chose 36 contractor executed between 1982 to 1988 by a Saudi or joint venture firm

  6. Research Methodology • Literature Review • Development of initial questionnaire • Collecting Data from contractor performance evaluation reports • Development of final questionnaire • Questionnaire Survey plus interviews • Data Collection • Data analysis • Conclusion and Recommendations

  7. Survey Questionnaire • Statistical Sample: 32 respondents from contractors • “Analysis Statically using the SAS mainframe computer package

  8. Results and Analysis • Factors Affecting Performance Samples: • General Requirements • Site Work • Materials • Specifications • Construction Divisions (Elec. , Mech. , ect.) • Results analyzed using different methodology techniques

  9. Study Conclusion • Big size contractor have higher performance than the small one • Design and construct type of contract have higher contract performance than construct type only • Contracts with change order tend to have a higher contractor performance • Higher monetary value contract have higher contractor performance

  10. Study Recommendation • Contractors Classifications have to be study before awarding contract • Contracts should be clear and straight • More supervision have to be made • Design and construct contracts are recommended for building construction contracts

  11. The End Thanks…