An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PATRONS OF ST. COLUMBAN FOUNDATION

  2. The goal of the foundation is to raise funds through bequests, government grants, personal donations and fundraising events to be used for capitol projects.  • Long term projects will include the repointing of the exterior walls, roof replacement, chimney and steeple work. 

  3. A five year plan is in place Phase 1 – 2008 A- Total replacement of the Cornice and repairs to the roof valleys where some leakage has occurred. B- Front (south) Tower Section Wall Elevation. Work involves repointing all joints, repair and/replace damaged stones, reinstate relevant stone details, caulk windows and replace accessible tower flashing.

  4. Some work has been completed

  5. Stone work & re-pointing

  6. Gaps between stones

  7. Needs repair

  8. Stone needing repair

  9. Mortar needed

  10. Mortar work done

  11. Stone needing repair

  12. Repaired stone

  13. Stone work to be done

  14. Stone repaired & re-pointed

  15. Re-pointing done No gaps between stones

  16. Re-pointing done

  17. Stone needing replacement

  18. New stone

  19. New stone

  20. Stonework re-pointed No gaps

  21. Scaffolding&Fascia

  22. Restoration in progress

  23. Flashing coming away

  24. Fascia needing repair

  25. Restored Fascia Re-pointing done

  26. Restored Fascia

  27. Restored Fascia

  28. Plan for 2009 Phase 2 -2009 Front (southeast and southwest) wall elevations. Work involves re-pointing all joints, repair and/replace damaged stones, reinstate relevant stone details, caulk windows and doors and stabilize southwest corner.

  29. The 5 Year Plan • Phase 3 -2010 • Phase 4 -2011 • Phase 5 -2012 More detail about the five year plan can be found on our website: www.stcolumbans.com

  30. PLEASE CONSIDER MAKING A DONATION