Excavation work is started. - PowerPoint PPT Presentation

garren
slide1 n.
Skip this Video
Loading SlideShow in 5 Seconds..
Excavation work is started. PowerPoint Presentation
Download Presentation
Excavation work is started.

play fullscreen
1 / 16
Download Presentation
94 Views
Download Presentation

Excavation work is started.

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. Excavation work is started.

  2. Excavation work continues.

  3. Foundation is poured.

  4. Foundation is finished.

  5. Modular house “boxes” are delivered and ready to be set on the foundation.


  6. Crane setting one of the modular house “boxes” on the foundation.

  7. Crane setting one of the modular house “boxes” on the foundation.

  8. The roof starts to get raised.

  9. The roof is raised.

  10. Crane setting one of the modular house “boxes” on the foundation.

  11. Crane setting the final “box” on the foundation.

  12. The modular house is completely set with the roof raised –all in one day. Next step is to complete the siding installation.

  13. Siding is completed. Next step is to build the front porch, and finish the interior work.

  14. Front porch under construction.

  15. Front porch is finished.

  16. This modular home was finished and moved into in a few short weeks.