An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Jeffrey Shaw, P.E. Safety & Design TST Risk Management for Highway Design

  2. “RISK” A factor, element, or course involving uncertainty regarding harm, loss, danger or damage

  3. Risk Management Test for Design • Does your agency have adequate and dynamic processes in place to identify existing and new risks faced? • Does your agency have the right balance of arrangements in place to deal with these risks? • Does your agency have an adequate framework for risk analysis and evaluation to support decision-making processes? Source: "Guide to Risk Assessment and Allocation for Highway Construction Management", FHWA-PL-06-032

  4. Risk Management Characteristics • Explicitly addresses uncertainty • Based on the best available information • Part of the decision-making process • Systematic, structured, and an integral part of organizational processes • Dynamic, iterative, responsive to change, and capable of continual improvement and enhancement • Accounts for human factors • Transparent and inclusive

  5. Risk-oriented Highway Design • Not a new concept • May involve different approaches and viewpoints • Who or what is “at risk” and what is the core motivation • Safety of Facility Users (i.e. motorists, pedestrians, etc.)? • Road Agency (tort liability concerns)? • Underlying theme is addressing the risk • Implication is that relying solely on standards does not guarantee a facility free of risk • Identifying/defining the risk is essential for managing the risk

  6. Fundamental Aspects • Understanding Design Risk involves: • Knowing the basis and assumptions underlying the standards • Defining the conditions of the project • Physical • Traffic • Safety

  7. Identify & Characterize the Degree of Risk • What are the variables that influence Risk? • Exposure • Traffic Volume • Location • Duration • Deviation from Nominal • Degree of variance • Severity of Outcome • Possible worst-case scenario

  8. Assessing Design Risks • Assessing the probability and severity of adverse consequences associated with activities, recommendations or designs. • Does not need to be a complicated quantitative assessment, but rather a practical assessment based on experience, engineering judgment and historical standard of practice. • To the extent possible, risks should be quantified, both on the basis of their potential probability and for their potential consequences.

  9. Risk-based Safety Analysis Tools • Safety Effects Studies • horizontal alignment • vertical alignment • cross-section • intersections • IHSDM (ihsdm.org) • Includes crash prediction, design consistency and capacity calc • Highway Safety Manual

  10. Risk-based Safety Analysis Tools • Latest Research and Best Practices • Design-stage Road Safety Audits

  11. NOMINAL SAFETY examined in reference to compliance with standards, warrants, guidelines and sanctioned design procedures SUBSTANTIVE SAFETY actual or expected crash frequency and severity for a highway or roadway segment or intersection Safety Performance Evolution

  12. RSAs Add Value to a Project • Compromises and constraints are a normal part of transportation budgeting • RSAs demonstrate the safety implications of roadway elements • RSAs ensure that safety is an explicit consideration, and that safety does not “fall through the cracks” • RSA focus corresponds to stage of project

  13. HIGH VALUE! Early Stage RSAs • PRECONSTRUCTION • planning / feasibility • preliminary (draft) design • detailed design • CONSTRUCTION • work zones • pre-opening • EXISTING • in-operation reviews

  14. Integrating RSA + VE • Consider the sequence scenarios of conducting both an RSA and a VE study on the same project • Possible Outcomes: • RSA conducted before VE • VE conducted before RSA • RSA and VE conducted in concert, with separate teams of individuals • http://safety.fhwa.dot.gov/rsa/resources.htm

  15. Considering Risk of Design Exceptions • Evaluating design exceptions in determining whether: • An appropriate criterion for a CORRIDOR is less than the minimum normally applicable (design speed, roadway width) • An appropriate design value to use at a LOCATION is less than the minimum standard (curve radius, gradient)

  16. Common Denominator of Highway Design • Effectively dealing with the “TRADE-OFFS” • Adding lanes vs. minimizing property takes • Clear zones vs. preserving mature trees • Property access vs. high mobility • Designing for vehicle traffic vs. accommodating other user groups

  17. Design Controls with High-Reward Potential • Functional Classification • Design Speed • Design Traffic • Design Vehicle • Design User

  18. Design Risk Management Process

  19. Link Between Risk Mgt and Flexible Design • Helps deliver both a PROJECT and a PROGRAM • Underlies a National Priority (FHWA and AASHTO) • Allows consideration of a wider range of alternatives and design options • Facilitates cost-effectiveness, with emphasis on increasing safety & efficiency

  20. Recognition of Risk-Reward Basis “It is not feasible or intended for highway projects to be entirely risk-free, as there are potential rewards to the project when risk is taken.“

  21. Using Risk Mgt to Improve Design • “In many cases, the risks associated with decisions can be mitigated with inclusion or enhancement of other features, which may offset the risk.” • “The evaluation of risk is an interdisciplinary process requiring involvement of project team members and stakeholders based on the specific issues and an evaluation of risk tolerability.”

  22. A Peer Model • Requires a Plan/Process • Identify Related Risks • Analyze in terms of Severity and Likelihood • Decide and Document • Permits either Quantitative or Qualitative Assessments

  23. NEW Related Training & Technical Assistance FY2010 NHI #380095 Highway Design: Applying Flexibility & Risk Management FHWA Resource Center Safety & Design Team www.fhwa.gov/resourcecenter/