An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OP “Transport and Transport infrastructure” 2014 - 2020 May22th, 2019 Sofia

  2. Operational Programme on Transport 2007-2013 • Total budget 2 003 481 166 EUR

  3. Operational Programme on Transport and Transport Infrastructure 2014-2020 • Total budget 1 887 587 260 EUR

  4. ACHIEVED INDICATORS – OPT 2007-2013 PA 1 Railways • 345 km railways rehabilitated PA 2 Roads • 310 km new roads • 19 km rehabilitated

  5. PA 1 • 6 metro stations • 6.7 km metro lines PA3 Intermodality • 14metro stations • 14km metro lines

  6. ACHIEVED INDICATORS – OPT 2007-2013 PA3 Intermodality • 3 railways stations rehabilitated PA 4 Waterways • River information system • VTMIS

  7. TARGET INDICATORS – OPTTI 2014-2020 PA 1 Railways • 166km railways rehabilitated PA 2 Roads • 67.1km new roads

  8. TARGET INDICATORS – OPTTI 2014-2020 PA3 Intermodality • 12metro stations • 12km metro lines • 1 metro depot • 20 metro trains • 6 railways stations rehabilitated

  9. TARGET INDICATORS – OPTTI 2014-2020 PA 4 Innovations • 3 River vessels • 2 Port waste installations • VTMIS • 97 km ETCS railway system PA 4 Innovations • VTMIS • 97 km ETCS railway system

  10. Programme specifics (1) • Major and complex infrastructure projects • Long preparation period • Long implementation period

  11. Programme specifics (2) • Land acquisition • Archeological sites • Public procurement

  12. CHALLENGESWHEN CARRYING OUT EVALUATIONS • Preparation of tender documents • Elaboration evaluation questions • Contract management • Quality of the evaluation

  13. COMMUNICATION CHANNELS OPTTI official site: www.eufunds.bg Exhausted projects information: https://www.eufunds.bg/bg/optti/term/643 • OPTTI YouTube channel: • > 560 followers • > 340 000 views https://goo.gl/n6QagT OPTTI Instagram channel: more than 130 publications https://goo.gl/3lEwuB

  14. EVALUATIONS IN 2007-2013 May22th, 2019 Sofia

  15. Evaluations – in 2007-2013 programming period • 4 evaluations • Carried out in 2011 and 2012 • To assist the management of the programme

  16. Evaluation of the efficiency of the implemented by beneficiaries project • Interim evaluation of the overall implementation of the programme • Evaluation of the monitoring system of the Programme • Evaluation on the horizontal principles integration in the management

  17. Budget of the evaluations • Total contracted - 326 144 EUR

  18. Main challenges when managing the evaluation contracts (1) • Piles of information to be presented to the evaluators

  19. Main challenges when managing the evaluation contracts (1) • To focus on most important findings and recommendations – ADDED VALUE

  20. Main challenges when managing the evaluation contracts (1) • How to communicate the results to the management body

  21. For further details visit the website of the programme at: www.optransport.bg • Summary of the four evaluations available at: http://www.optransport.bg/en/page.php?c=201&d=1662&q=evaluations

  22. Thank you for your attention!