This presentation by Christoph Hessler explores failure checks of the MBB/MBS power converters for the TT66 layout at a dedicated HiRadMat Interlock Meeting. The analysis considers various scenarios with different reaction times and displacements of the power converters. Understanding these failure patterns can enhance the efficiency and safety of the system in high-radiation environments.
E N D
MBB/MBS failure checks for TT66 Christoph Hessler 22.04.2010 Dedicated HiRadMat Interlock Meeting
TT66 Layout TI 2 MBS MBB TT66 Christoph Hessler
s=0.1mm, MBS power converter fails x [m] n1 5 ms reaction time Christoph Hessler
s=0.1mm, MBB power converter fails x [m] n1 5 ms reaction time Christoph Hessler
s=0.1mm, MBS and MBB power converter fail x [m] n1 5 ms reaction time Christoph Hessler
s=0.5mm, MBS power converter fails x [m] n1 5 ms reaction time Christoph Hessler
s=0.5mm, MBS and MBB power converter fail x [m] n1 5 ms reaction time Christoph Hessler
s=2.0mm, MBS power converter fails x [m] n1 5 ms reaction time Christoph Hessler
s=2.0mm, MBS and MBB power converter fail x [m] n1 5 ms reaction time Christoph Hessler
s=2.0mm, MBS power converter fails x [m] n1 10 ms reaction time Christoph Hessler