An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Intermediate upgrade plan 16 Dec 2004 T.Tsuboyama (KEK) For detail, please visit http://belle.kek.jp/group/svd/SuperB/meetings/

  2. Discussion Background • I apologize I did not make positive discussion on “how to survive with SVD2.0” in BGM. • At BGM, spokes persons asked each sub detector groups more aggressive upgrade plan, which should be robust against 3-5 times luminosity and background. • The following plan is discussed in yesterday’s SVD3 meeting and here assuming • 2006 summer-- SVD2.X installation • Implies 2005 --- whole preparation • If we install SVD2.x in 2007,

  3. Fiscal year 2005(I) • DSSD production: 12 DSSD needed. 16 or 20 will be produced. 12 Myen. • Outer dimensions should be same as that for SVD2.0 DSSDs. • Internal design can be optimized for APV25 readout. • Hybrid (Glass epoxy) 24 necessary, 50 will be produced. Two trial 3 Myen. • Hybrid cables (Not defined yet) 1.5 Myen • Power supply/cooling --- Recycle the present system. • Assemblt Princeton or Melbourne • Fixture should be recycled. • Ladder parts 2Myen at most. • flex should be newly designed to connect DSSD and APV25 hybrid.

  4. Fiscal year 2005(II) • FADC: Vienna • PC interface card should be compatible with that of SVD2 • Structure and IP chamber: recycle SVD2 parts.

  5. Fiscal year 2005(III) Undecided yet: Repeater system • Repeater system: 2 necessary, 2 spare/test 8Myen • We do not have enough time for iteration. • Is 40MHz analog/digital signal can be transferred in 40m cables? • Can SVD2 MAMBO recycled? • Then constraints to AVP25REBO is clear. • Who will take care of the repeater? • Timing distribution: Can TTM recycled?

  6. Fiscal year 2005(IV) Default upgrade • Whatever we decide, luminosity and background will increse. Independent of L1 choise, we need • Faster readout of VA1TA 2 Myen • L0 trigger upgrade 5 Myen • Adding PC farm 5 Myen

  7. Funding profile • If SVD2.X is installed in 2006 summer, most money should be spent in 2005 • In 2006 only system test and installation remains. • Should installation in 2006 failed, • I guess the reason is in preparation of repeater system and/or signal transfer between hybrid and repeater system. • Iteration of repeater system 3Myen • Iteration of hybrid cabling (matching card?) 1Myen • Extend group. • First ladder production