status of seat ife integration standardization wiring practice group oct 19 20 2000 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Status of Seat/IFE Integration Standardization & Wiring Practice Group (Oct. 19-20, 2000) PowerPoint Presentation
Download Presentation
Status of Seat/IFE Integration Standardization & Wiring Practice Group (Oct. 19-20, 2000)

Loading in 2 Seconds...

play fullscreen
1 / 5

Status of Seat/IFE Integration Standardization & Wiring Practice Group (Oct. 19-20, 2000) - PowerPoint PPT Presentation


  • 286 Views
  • Uploaded on

Rob Hofmann - MAS, Team Captain Allen Stewart - MAS, Team Captain Thorsten Steinlicht - Airbus, Co-Team Captain Tom Aliffi - Delta Air Lines, Co-Team Captain. Status of Seat/IFE Integration Standardization & Wiring Practice Group (Oct. 19-20, 2000). WAEA Seat Integration Workshop.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Status of Seat/IFE Integration Standardization & Wiring Practice Group (Oct. 19-20, 2000)' - flavio


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
status of seat ife integration standardization wiring practice group oct 19 20 2000
Rob Hofmann - MAS, Team Captain

Allen Stewart - MAS, Team Captain

Thorsten Steinlicht - Airbus, Co-Team Captain

Tom Aliffi - Delta Air Lines, Co-Team Captain

Status of Seat/IFE Integration Standardization & Wiring Practice Group (Oct. 19-20, 2000)
waea seat integration workshop
WAEA Seat Integration Workshop
  • Action Item Review
    • Reviewed WAEA presentation from Seat Integration Educational Breakout Session, 2000 WAEA Annual Session (Ref. www.waea.org/workinggroups)
    • Reviewed ARINC 628 Parts 2 and 5.
    • Defined recommend additions to documents.
    • Drafted closing statement.
waea seat ife integration workshop
WAEA Seat/IFE Integration Workshop
  • ARINC 628 Part 2 Review and Recommendations
    • Reviewed WAEA presentation from Seat Integration Educational Breakout Session, 2000 WAEA Annual Session (Ref. www.waea.org/workinggroups)
    • Reviewed ARINC 628 Parts 2 and 5.
    • Defined recommend additions to documents.
    • Drafted closing statement. Need to overhaul general specification and Supplement 1
    • Consider classifications of seat envelopes for first, business, and coach class seats that allow for common IFE installations
waea seat ife integration workshop1
WAEA Seat/IFE Integration Workshop
  • ARINC 628 Part 2 Review and Recommendations
    • Study concept of modular LRU designs limited to 2-3 sizes and apply concept to new generation IFE
    • Concentrate on standardization of “invisible parts” - SEB’s, under-seat LRU’s, etc
    • Provisions for cooling - ref. ARINC 628 part 7
    • Standardize Seat LRU mounting patterns
    • Consider impact of Seat LRU orientation
    • Request that OEM’s take leadership role in obtaining and defining general seat LRU envelope sizes
waea seat ife integration workshop2
WAEA Seat/IFE Integration Workshop
  • ARINC 628 Part 5 Review and Recommendations
    • Request that Airlines, their seat suppliers, and industry review Part 5 and provide feedback before 11/15/00 to Earl Nicks (ARINC) and Sheryl Bryant (Boeing) to allow group circulation to support the next CWG meeting in January 2001
    • Consider a separate CEI meeting and chair to oversee IFE/SEAT activities in conjunction with the general CEI subcommittee meetings.