ECE 4006B Fall, 2002, Group 2, Jasmine Green Progress Report Period (10/12-10/17)

Finalized and Order PCB Ordered passives Create outline for paper Divide parts of the paper. Write the report Assemble the PCB board. ECE 4006B Fall, 2002, Group 2, Jasmine Green Progress Report Period (10/12-10/17). Progress:. Planned work:. Paper Outline I. Introduction II. Background

finian
Download Presentation

ECE 4006B Fall, 2002, Group 2, Jasmine Green Progress Report Period (10/12-10/17)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Finalized and Order PCB Ordered passives Create outline for paper Divide parts of the paper Write the report Assemble the PCB board ECE 4006B Fall, 2002, Group 2, Jasmine GreenProgress Report Period (10/12-10/17) Progress: Planned work:

  2. Paper Outline I. Introduction II. Background III. Provided Test Board IV. Optical Link Budget V. Parts VI. Design of Rx VII. Design of Tx VIII. PCB Layout Design IX. Closing Max Shirley – Intro, Background & Closing Alex Griffith – Design of Tx, Rx & PCB Layout Design Nilay Patel – Optical Link Budget Dave Autin – Parts & Editor Jasmine Green – Provided Test Board ECE 4006B Fall, 2002, Group 2, Jasmine GreenProgress Report Period (10/12-10/17)

  3. ECE 4006B Fall, 2002, Group 2, JasmineGreenProgress Report Period (10/12-10/17)