An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SLAs Are Us • The Quilt Fiber Workshop • St Louis October 13, 2006 • Paul Schopis • pschopis@oar.net

  2. SLA • Hold MoU with each institution • SLA is stated in MoU • Guarantee no more than 10 Minutes of outage • 75 ms RTT to any core node • For K-12 Four Hour outage • Scheduled outages require at least 24 hour notice & ITIL like CMP

  3. Measurement • Nagios • Statseeker • Cisco Transport Manager • Although it is not part of SLA we have stated goal of five nines

  4. Service Contracts & Penalties • If outage is longer than 10 minutes we credit one day’s worth of service • We will assist campus in local loop issues • Impact is minimal because you are us

  5. Sparing • Buy maintenance on routers per chassis so we can get software updates • Self spare on line cards • Optical came with 5 years 14 day RMA and software upgrades • Self spare one to two of everything; decide based on failure rates • Buy annual maintenance on additional cards

  6. SLAs and NetworkDesign • Fully redundant rings • Have spare route engines and power supplies; decided that a second chassis did not buy much • Use MPLS fast route i.e. layer 2-3 protection because we are transponder based

  7. A Tale of Two SLAs • BOR grant program for HPN connections to TFN • Grant requires that campus prove that performance meets stated criteria • Has mechanisms for how performance is measured • ActiveMON