An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical specifications of Zimniy Theatre.Sochi concert philharmonic association.

  2. Historical • The building of Zimniy Theatre in Sochi was constructed in 1937 according to the design of the architect K.N.Chernopyatov. The first in the history of the Winter Theatre theatrical season was solemnly opened with the opera “Tzar’s Bride” by N.Rimsky-Korsakov staged by Moscow Musical Theatre named after K.S Stanislavskiy  and N.V.Nemirovich-Danchenko on May 15, 1938. • Zimny Theatre features 977 seats • The building erected in neoclassicism style is surrounded with 88 columns and fits well into peculiar look of the southern resort. Open foyer is decorated with a colonnade. The hall is lit with a huge stamped chandelier decorated with brightly glittering crystal. 

  3. Historical background In 2005 the interior has been completely renovated; during the renovation the technical equipment, stage curtain, act drop and  arm-chairs were replaced.The orchestra pit was enlarged, so music bands and ballet companies with grand orchestras can perform on the stage of Zimniy Theatre now. The considerate modern builders saw to spectators’ comfort. The systems of heating and air-conditioning were installed.The stage of the main theatrical ground of the Resort is never vacant. Valery Gergiev, Dmitry Khvorostovsky, Nikolay Petrov, Oleg Tabakov, Paata Burchuladze, Khibla Gerzmava, Yury Bashmet, Mikhail Kazakov, Lubov Kazarnovskaya, Sergey Yursky – the names of famous actors, singers andmusicians adorn the posters of  the Winter Theatre all year round.

  4. Audience hall scheme

  5. AUDIENCE HALL

  6. The list of the lightning equipment of the stage 1. Light console – Road Hog Full Boar-3 2. Portals: - 8 spotlights PAR -64, Theatre Spot 1000W.PC from each side 3. Towers on the shifting carriages: 5 PAR -64, and 5Theatre Spot 1000 W. PС from each side. 4. 2 Follow Spots Сoemar Pilota 1200 are installed in the front loge (projection room). 5.There is no footlight and border-light. 6. There is no equipment on the gallery, but there are electric connectors – 16 regulated channels and 3 unregulated. Рис. 1 Tower Рис. 2 Tower 2

  7. The list of the lightning equipment of the stage 7. 6 rows of soffits: - from 1 to 4 soffits - Theatre Stage Lightning Chromo 2000 W. F. 6 of them are with scrollers; - 2 iWASH - 575 coemar; - 3 iSPOT - 575 coemar; Every lighting stand has free electric connectors: -10 regulated; -8 unregulated; - from 1 to 3 soffits have flood lights: red, yellow and blue. 8. Every front light loge is equipped with : - 4 Theatre Spot 1000 W. PС; - 3 Theatre Stage Lightning Chromo2000 W. F; - 6 PAR-64 with 16 band- pass scrollers; - 4 iWASH - 575 coemar. Рис. 1Light loge Рис. 2 Light loge 2

  8. The list of the lightning equipment of the stage 9. Right and left wall plates – 6 regulated connections and 4 unreulated from each side. Backing- 8 regulated channels and 8 unregulated. Circle - 2 regulated channel and 2 unregulated. 10. CEE standard connections; -400 dimmer channel. The output of the one dimmer channel is 4 kW Рис. 1 Switch Plates Рис. 2 Soffits

  9. Specification of the sound equipment of the stage Remote control SOUNDCRAFT MH2 Processing: Lexicon MX200, YAMAHA SPX 990. 1 MD-playerTascam 2 СD/MD- player Tascam PortalsElectro Voice. 2monitor lines - 2 monitors Electro Voice. Equalization of the audience hall and portals DBX. Microphones: Shure- Slx - 4 pieces. Shure- Sm 58 – 4 pieces. Shure- Sm 81 - 2pieces. Hanging microphone - 4 pieces.

  10. Specification of the sound equipment of the stage • Mooving Head - Coemar I SРОТ 575 – 11 pieces. • Mooving Head - Coemar I WASH 575 -14 pieces. • Follow spot - 1200 Вт – 2 pieces. • Lens spotlight РС 1000 - 35 pieces. • Lens spotlight F 2000 - 36pieces. • Scrollers for F - 2000 - 30 pieces. • Scrollers for PAR 64 - 32 pieces . • PAR 64 - 58 pieces. • Asymmetric spotlight 1 kw - 64 pieces. • Smoke generator - 1piece. • Dimmer system - Фаворит 256 каналов х 3 квт • Direct connections- 98 channels х 3kw

  11. Specification of the sound equipment of the stage • Portal Electro Voice • Remote control: Sound Craft - 32 • Microphones: Shure SM 58 - 4 pieces (cord, hand) • Microphones : Shure ezb/c - 4 pieces (hanging) • Microphones: Shure SМ 81 - 2 piecs (instrumental ) • Microphones : Shure SМ 58 SLХ – 4 pieces (radio,hand) • Effect processor: УАМАНА SРХ 990 -1 piece • Monitor equalizer: DBX • 2 MD - player: ТАSСАМ • 1 CD- player: ТАSСАМ • 4 monitors Electrovoice

  12. Zimniy Theatre Stage

  13. Make-up rooms 1 floor • 1.room № 6 VIP-1-3 seats, shower booth, sofa set • 2.room № 7 6 seats, shower booth • 3.room № 8 6 seats, shower booth 3 floor • 1.room № 41 8 seats, washstand • 2.room № 42 8 seats, washstand • 3.room № 43 19 seats, 3 shower booths • 4.room № 44 21 seats, 3 shower booths. All the make-up rooms are equipped with ceiling and local light.

  14. Conditioning system • The foyer and audience hall is conditioning by 2 central air conditioners YORK-YSS installed in 2005. The minimum temperature is +15 С, the maximum+ 30 С. • In conditioning system the floor–mounted air-conditioning units are used.

  15. Electricity supply • The electric power substation “Vereshaginskaya” supplies the Theatre with the electricity. • Electric power supply 0,4 kW is carried out by means of transformer substation that is situated in the building of Zimniy Theatre. Two transformers ( 1000 kW) are installed. • In 2005 an emergency diesel-generator with the capacity of 135 kW was installed, it is working in the automatic mode. The nominal load with all inner and activated power users is less than 300 kW, in case of matched load it amounts to 2 000kW, that allows to connect additional inner and outer energy users.

  16. Contact information • Chief ExecutiveOfficerSochi’s concert philharmonic association VladimirMISHARIN+7(8622) 62-50-29 – receiving office e-mail: v_misharin@inbox.ru • Administrative Director DmitryBONDARENKO+7(9622) 62-38-10e-mail: bondarenkodo@gmail.com • Chief engineer ValeryPILIPAS +7(8622) 61-15-03 • Production manager YuryDmitriev+7(8622) 62-16-07