1 / 19

March 14, 2013

March 14, 2013. CSSC Transportation Update. APG Traffic Counts. Harford Gate (MD-22). Maryland Gate Gate (MD-715). APG Traffic Counts. Inside the Numbers Harford Gate (MD-22) Average 5,386 vehicles 6 – 9 AM Maryland Gate (MD-715) Average 3,316 vehicles 6 – 9 AM Totals for APG North

faye
Download Presentation

March 14, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. March 14, 2013 CSSC Transportation Update

  2. APG Traffic Counts Harford Gate (MD-22) Maryland Gate Gate (MD-715)

  3. APG Traffic Counts • Inside the Numbers • Harford Gate (MD-22) • Average 5,386 vehicles 6 – 9 AM • Maryland Gate (MD-715) • Average 3,316 vehicles 6 – 9 AM • Totals for APG North • Average 8,702 vehicles 6 – 9 AM

  4. APG Priority Intersections

  5. APG-BRAC Intersections • MD-714 / US Rt. 40 • Fully funded for all phases • Under construction • Under budget and ahead of schedule • Little concerns with traffic detour (excellent communication) • Ramp to open June / July 2013 • Intersection open for traffic Summer 2013

  6. APG-BRAC Intersections • US 40 / MD 7 / MD 159 • Two phase project • Phase 1 (underway) = Two left turn lanes on Rt. 7 • Phase 2 = Widening US 40 to allow two additional lanes in each direction / updating phase one to include two left turns, one shared through lane, and one channelized right • ROW $1.06 million (funded) • Utilities $4 million (funded) • Cost $11 - $13 million

  7. APG-BRAC Intersections • MD-22 / Old Post Road • Fully funded for all phases • 100% design • Cost $7 - $10 million • Schedule • Advertise April 2013 • Construction spring / summer 2013 • Open to traffic spring 2015

  8. APG-BRAC Intersections • MD-22 / Paradise Road • Funded for design and ROW • 99% design • ROW acquisition underway • Cost $9 - $12 million • Schedule • Construction spring / summer 2015 • Open to traffic spring 2017

  9. APG-BRAC Intersections • MD-22 / Beards Hill Road • Funded for design and ROW • 75% design • Cost $9 - $12 million • Schedule • Complete design winter 2013 • Construction spring 2014 • Open to traffic spring 2016

  10. MD Rt. 22 Corridor Analysis • Federally funded through Baltimore Metropolitan Council (20% local match) • Rt. 22 Bel Air to Aberdeen • Short, medium, and long term projects • Low hanging fruit • Access management • Stripping, signage • Bike / Ped • HOV concept

  11. MD Rt22 Corridor Analysis Maryland Quality Initiative Awards Harford County / Johnson, Mirmiran, & Thompson (JMT)

  12. Train Service to APG • New Edgewood train station • Protection of current train stops • APG shuttle program • Commuter bike program

  13. Telework Study • Examine APG’s current telecommute policy and identify best practices among similar defense communities • Offer recommendations that APG could adopt in support of telework and TDM efforts • RFP process underway • Advertise April 2013 • Award June 2013

  14. APG TDM Workgroup • Promote use of alternatives to SOV travel. • Create base TDM communication program. • Create incentive programs to encourage non-SOV travel. • Promote work patterns to reduce peak demand.

  15. APG-CSSC Transportation Center –Ribbon Cutting

  16. CSSC Transportation Coordinator –Syreeta Gross

  17. APG-CSSC Transportation Center • Support APG TDM efforts • Increase awareness of existing transit options • Serve as communications center for transit • Coordinate telework study • Promote alternatives to SOV travel • Collect data to support effort

  18. Funeral Services for Dr. Billy Richardson • Arlington National CemeteryWednesday, March 20, 2013 3:00 p.m.  (2:30 ARRIVAL/Meet at Administration Building) • Please arrive a half hour prior to the service.You will need to rely on your own transportation from the Administration Building to his burial site in the cemetery. • From the Arlington National Cemetery Website:BILLY RICHARDSON, COL, US ARMY Administration Building 03/20/2013 - 3:00 PMhttp://www.arlingtoncemetery.mil/FuneralInformation/HoursOperation.aspxhttp://www.arlingtoncemetery.mil/VisitorInformation/Directions.aspx?tb=4

More Related