KASTURI FOUNDRY PVT.LTD. ASHTA. DECEMBER -2011. COMPARATIVE PRODUCTION STATUS. TARGETSALE VS ACTUAL SALE. CUSTOMER WISE SCHEDULE VS DISPATCH NOVEMBER-2011. COMPARATIVE PRODUCTION STATUS. PART NAME & NUMBER:- R A HOUSING. Actual Working 18 Day's Capacity - 6870.

fausta
Download Presentation

DECEMBER -2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KASTURI FOUNDRY PVT.LTD. ASHTA DECEMBER -2011

  2. COMPARATIVE PRODUCTION STATUS TARGETSALE VS ACTUAL SALE

  3. CUSTOMER WISE SCHEDULE VS DISPATCH NOVEMBER-2011

  4. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- R A HOUSING Actual Working 18 Day's Capacity - 6870 *** R A HOUSING LINE UTILISATION FOR 61.73%

  5. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- 35 HP FLY WHEEL *** R A HOUSING LINE UTILISATION FOR 80.00%

  6. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- R S HOUSING Working day 20 Capacity - 3900 *** R S HOUSING LINE UTILISATION FOR 80.98 %

  7. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- COVER GEAR Working day 24 Capacity - 1008 *** COVER GEAR UTILISATION FOR 44.36 %

  8. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- R A HOUSING Machine problem 41.50 Hrs. / Casting no load 36.00 Hrs. /Electrical problem 36.00 Hrs. MSD-1NEWDRILL SET MSD-02 NEW DRILL SET / SPM-11 DIA-16.5 DRILL 08 No's USED. Note:- To calculate labor cost take 35% overhead on Basic+DA

  9. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- 35 HP FLY WHEEL Note:- To calculate labor cost take 35% overhead on Basic+DA

  10. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- R S HOUSING Mechanical & Electrical problem 45.25 Hrs. Note:- To calculate labor cost take 35% overhead on Basic+DA

  11. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- COVER GEAR DISPATCH QTY 724 Nos. & Machining Qty - 970 Nos. Note:- To calculate labor cost take 35% overhead on Basic+DA

  12. MACHINE UTILISATION IN % R A LINE (SPM -05 & SPM -12) DUE TO EXCESS STOCK FOR DISPATCH LINE IDLE 7 DAYS CASTING NO LOAD 56.0 HRS CMM PROB.16.0 HRS.

  13. MACHINE UTILISATION IN % 35 HP FLY( D-FACE Ist OPN)

  14. MACHINE UTILISATION IN % R S LINE (SPM-23)

  15. MACHINE UTILISATION IN % COVER LINE ( VMC M/C )

  16. Breakdown Details (Whole shop) SPM-01 – 17.50 / SPM-19 -35.50 / SPM-17 – 18.00 / SPM-20 – 11.50 / TAL-04 – 10.50 Hrs. COVER SECCTION ABSENT 224 .00 Hrs. / R.A & R.S SECTION ABSENT 17 .00 Hrs. R.A Section 36.00 Hrs. / R.S SECTION 07.25 Hrs. & COVER Section 35.75 Hrs. R.A Section 36.00 Hrs. / R.S SECTION 16.25 Hrs. & COVER Section 8.00 Hrs.

  17. REJECTION DETAILS(ITEMWISE IN %) Part Name:- R A HOUSING ***ACTION ON MAJOR REJECTION CAUSES

  18. REJECTION DETAILS(ITEMWISE IN %) Part Name:- 35 HP FLY WHEEL ***ACTION ON MAJOR REJECTION CAUSES

  19. REJECTION DETAILS(ITEMWISE IN %) Part Name:- R S HOUSING ***ACTION ON MAJOR REJECTION CAUSES

  20. REJECTION DETAILS(ITEMWISE IN %) Part Name:- COVER GEAR VMC-03 MACHINE ARM PROBLME MR QTY 10 ***ACTION ON MAJOR REJECTION CAUSES

  21. OVERALL REJECTION (All Parts) TOTAL MACHINING QTY 13853 & FOUNDRY REJECTION 929 Nos. ***ACTION ON MAJOR REJECTION CAUSES

  22. TWO CUSTOMER COMPLENT IN ONE PARAMETAR – M16 Tapping (6 Holes) • PART- R S HOUSING • M16 threading . Fitment is not possible. • Male Part Fitment method & Tightening Condition at JOHN DEERE assy. Stage.. CUSTOMER COMPLENT CUSTOMER COMPLENTS TREND CHART TREND

  23. CORRECTIVE ACTIONS • Instructions given to all Operators, Supervisors & Inspectors about IMPORTANCE OF CHAMFER AT ASSEMBLY STAGE. • SPM 16 Master pieces to kept at Opn. 170 for Chf. Visual Inspection awareness. • Design Gauge for M 16 Chf. Feeling.

  24. COST OF POOR QUALITY R S Housing Line NEW OPERATORS ( CONTRACTORS ) Qty. 86 Nos. ***ACTION ON MAJOR REJECTION CAUSES

  25. LABOR EFFICIENCY NOVEMBER - 2011

  26. LABOR EFFICIENCY DECEMBER - 2011