An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cape Elizabeth Schools Project Build

  2. The Two Key Areas of The Renovation Project 1. High School Updates 2. Relocation of Kindergarten

  3. Cape Elizabeth High School Original mechanical systems from the 1960’s need to be replaced school-wide. When Kindergarten was included, High School enrollment was less than 400. High School enrollment is expected to reach 600 in 2004-05.

  4. High School Community Speaks Out

  5. Increased Special Ed Needs • Special education population is growing • Resources need to be provided for a variety of disabilities • In 2002-03 there are... • More students than ever with varied special needs • Less classroom space than ever • Additional space is needed for... • Standard programs • New technical equipment for book scanning, computer programs and life skills training. Claire LaBrie: Special Education Administrator

  6. High School Parking • The parking at the High School is very close and cars are often parked illegally. Many people park in “no parking zones” where fire trucks should be able to get in. • Making the parking lots bigger should fix this.

  7. Ceilings Are Falling Apart MOST OF THESE CEILINGS ARE DAMAGED BY PIPE BURSTS !

  8. Scott Shea Talks About The Gym • The gym floor has no cushioning. It is laid right on cement and causes many injuries. • The gym roof leaks. • The bleachers are old and very hard to pull out and push back in.

  9. High School Cafeteria Needs More Space • Kids sit on the radiators and on the floor in the hallways. • Each kid should have a table and chair to sit and eat lunch.

  10. High School Students Talk About Cafeteria • “It’s pretty tough to get a table,” says Aaron Dulac, a Sophomore at Cape Elizabeth High School. • “I think its harder to get a chair than a table,” said Eric Sprague. Aaron Dulac Zach Rioux Eric Sprague

  11. HS Needs Storage Space! • These two ladies (behind the soccer goals) work in this storage area. It is an office and a storage room! • The Gym/Athletic equipment and uniform storage are spilling in hallways.

  12. Band Room • This room is supposed to be used for band practice. It doubles as a storage room.

  13. Science Labs Need New Equipment • The science materials are about 33 years old. • Science technology has changed in the last 33 years and they need updated equipment. • The storage space and the sinks are revolting!!

  14. Cape Elizabeth High School Places that Need Work • Seating Space in Cafeteria • Gym Floor • Parking Space • ADA Mandated Access Areas • Special Ed Resources • Science Lab Updating • Art Program Resources • Phone Lines For Teachers • Replacing Building Mechanics • Storage Space

  15. Pond Cove School • Pond Cove is the recommended location for the new Kindergarten

  16. The High School needs all of this space for Math classrooms. THE KINDERGARTEN WING

  17. Pond Cove Staff and Students Speak Out

  18. Kindergarten Needs More Space, Too <--Here, kids are crammed into the kitchen to learn with a teacher! <-- Kids also get special help in the Occupational Therapy Room which doubles as a storage room.

  19. Pond Cove Summary • High School needs space • Recommended location of Kindergarten • is with other elementary grades • No available classrooms at Pond Cove • Parents support this move • Community Center is not an option

  20. Ms. Hutton’s Comments

  21. -Credits- Creators: Special Thanks to: Morgen Alden Tom Eismier- Pond Cove Principal Ashley Barnett Mrs. Hutton- Middle School Principal Kiersten Brown Jeff Shedd- High School Principal Alex Caron Gary Lanoie- Tech. Coordinator Charlie Governali Mrs. Smevog- Computer Teacher Tom Michaud Jason Lund- Technician Andrew Nelson All other teachers and staff Rebecca Simmons And all other interviewees Nick Whiteman

  22. The End