1 / 4

Daniel E. Rivera Department of Chemical and Materials Engineering Arizona State University

ECE 100: Introduction to Engineering Design Modeling Assignment No. 3 Inventory Management Using PID Control (Continued); Stochastic Modeling. Daniel E. Rivera Department of Chemical and Materials Engineering Arizona State University. Some Course Business Items….

eve-howell
Download Presentation

Daniel E. Rivera Department of Chemical and Materials Engineering Arizona State University

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ECE 100: Introduction to Engineering Design Modeling Assignment No. 3Inventory Management Using PID Control(Continued); Stochastic Modeling Daniel E. RiveraDepartment of Chemical and Materials EngineeringArizona State University ECE 100: Intro to Engineering Design, Presentation No. 14

  2. Some Course Business Items… • Modeling Assignment No. 2 currently being graded and will be returned on Thursday • Please calculate Inventory Holding costs on the basis of on-hand (and not net) stock. Otherwise you may get negative total costs… • Use office hours, other means of communication if you are having problem understanding the assignments. ECE 100: Intro to Engineering Design, Presentation No. 14

  3. Modeling Assignment No. 3 • Add an engineering-based Proportional-Integral-Derivative (PID) decision policy to your previous Excel-based simulation that compares the four EOQ strategies. • Use your simulation to determine which choice of controlled variable (net stock or inventory position) is “best” suited for this application. • Evaluate each choice of controlled variable for a 60-day time period; generate both deterministic and stochastic simulations. • Details provided in the Modeling Assignment No. 3 sheet. ECE 100: Intro to Engineering Design, Presentation No. 14

  4. Coming Up • Thursday, March 13: Modeling Assignment No. 3 due. Project 1 description will be distributed. We will return to ECG 347 for this class session. ECE 100: Intro to Engineering Design, Presentation No. 14

More Related