Are contractors ready to build a 21th century railway on Scandinavian soil?

Intro dias. Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack , Aarsleff. Overskrift med 40 pt. i en linje. Rubrik, navn eller afdeling med 20 pt. i en linje. CONTENTS BUILDABILITY. - BACKGROUND - GEOLOGY AND GEOMETRY - RISKS

euclid
Download Presentation

Are contractors ready to build a 21th century railway on Scandinavian soil?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Intro dias Are contractors ready to build a 21th century railway on Scandinavian soil? 2013-04-10 | Nicholas Lusack, Aarsleff Overskrift med 40 pt. i en linje. Rubrik, navn eller afdeling med 20 pt. i en linje.

  2. CONTENTS BUILDABILITY • - BACKGROUND • - GEOLOGY AND GEOMETRY • - RISKS • - BRIDGE vs CONVENTIONAL RAILWAY • - LOGISTICS and LEAN PRODUCTION • - CONCLUSION

  3. BACKGROUND ECONOMIC BENEFITS Project Client Floire Nathanael Daub The Scandinavian 8 million City Reinertsen Sverige AB: Nicholas Lusack Fredrik Karlsson Stefan Krii Anna Olsson Steer Davies Gleave: Charles Russell Favorit Consult Floda: Elke Rosiers

  4. PER AARSLEFF A/S

  5. GEOLOGY AND GEOMETRY RECENT EXPERIENCE

  6. CLAY AND HARD ROCK FORMATIONS PERPENDICULAR RIDGES AND VALLEYS

  7. CLAY AND HARD ROCK FORMATIONS ALONG RIDGES AND VALLEYS

  8. Sidefod RISKSTABILITY Scene 1 from the quick clay landslide in Rissa 1978 – YouTube http:/

  9. RISK WAVES AND VIBRATIONS • IMPACT • Structural damages and limitations i.e. • Embankment deformation • Train vibrations • Vibrations in buildings and other structures • Deformations in other structural foundations • Speed limitations (230 km/h)

  10. Sidefod RISKSETTLEMENTS (differential) http:/

  11. HARD ROCKS OBSTACLE AND RESOURCE

  12. GROUND WORKS EMBANKMENTS AND CUTTINGS • HIGHWAY E6 EMBANKMENT • PILED EMBANKMENT • LENGTH 180 m • HEIGHT 12 – 16 m • CREST WIDTH 22 m • WIDTH AT TOE 65 M • REINFORCED WITH 58 000 m PILES • COST OF INSTALLED PILES 22 MILLION SEK (1998) • APPROXIMATED TOTAL COST 50+ MSEK • EQUALS 2.8 BILLION SEK / 10KM

  13. GIANT LEAPHSR vs CONVENTIONAL RAILWAY

  14. LOGISTICSUNCONVENTIONAL METHODS

  15. PRODUCTIONINDUSTRIAL

  16. PILED BRIDGE FOUNDATIONS BENEFITS • LESS INVASIVE • REDUCED LAND CLAIM • NO SETTLEMENTS (DIFFERENTIAL) • CONTROLLED STABILITY • PRECAST MATERIALS ENHANCES LEAN PRODUCTION • OTHER BENEFITS SUCH AS SNOW DRIFT, NO BARRIER ETC.

  17. Intro dias Are contractors ready to build a 21th century railway on Scandinavian soil? Overskrift med 40 pt. i en linje. Rubrik, navn eller afdeling med 20 pt. i en linje.