linac hins proton driver civil design synergies n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
LINAC HINS/Proton Driver Civil Design Synergies PowerPoint Presentation
Download Presentation
LINAC HINS/Proton Driver Civil Design Synergies

Loading in 2 Seconds...

play fullscreen
1 / 8

LINAC HINS/Proton Driver Civil Design Synergies - PowerPoint PPT Presentation


  • 149 Views
  • Uploaded on

LINAC HINS/Proton Driver Civil Design Synergies. Dixon Bogert Fermilab Accelerator Advisory Committee May 10 th – 12 th , 2006. Reporting Work by FESS – Elaine McCluskey And Chuck Federowicz Tom Lackowski Paul Lahn Rod Walton Gary Van Zandbergen. Outline. Siting – Inside Main Ring

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'LINAC HINS/Proton Driver Civil Design Synergies' - etta


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
linac hins proton driver civil design synergies

LINAC HINS/Proton DriverCivil Design Synergies

Dixon Bogert

Fermilab Accelerator Advisory Committee

May 10th – 12th , 2006

Reporting Work by FESS – Elaine McCluskey

And

Chuck Federowicz Tom Lackowski Paul Lahn

Rod Walton Gary Van Zandbergen

HINS/PD Civil – AAC Review May 10-12, 2006 Dixon Bogert

outline
Outline
  • Siting – Inside Main Ring
  • Major Elements of Construction for HINS & ILC
    • Overview on Site Plan
    • Cross-sections of tunnels/service building
      • HINS
      • ILC
    • Plans of HINS Klystron Gallery & ILC Service Tunnel
  • ILC TF Deficiencies with respect to HINS facility
  • HINS Consultant Engineering Work in FY06

HINS/PD Civil – AAC Review May 10-12, 2006 Dixon Bogert

linac proton driver site plan
Linac Proton Driver Site Plan

5 GeV ILC TF LINAC

0 - 8 GeV HINS LINAC

HINS/PD Civil – AAC Review May 10-12, 2006 Dixon Bogert

hins linac enclosure klystron gallery
HINS Linac Enclosure/Klystron Gallery

HINS/PD Civil – AAC Review May 10-12, 2006 Dixon Bogert

ilc twin tunnels
ILC Twin Tunnels

HINS/PD Civil – AAC Review May 10-12, 2006 Dixon Bogert

klystron gallery hins tunnel ilc
Klystron Gallery (HINS)/Tunnel (ILC)

120 ft

HINS GALLERY

118 ft

ILC SERVICE TUNNEL

HINS/PD Civil – AAC Review May 10-12, 2006 Dixon Bogert

ilc tf deficiencies w r t hins facility
ILC TF Deficiencies w.r.t. HINS Facility
  • Below grade service gallery presents operational difficulties for HINS
  • In ILC service tunnel, equipment arrangement &tunnel connections to beam tunnel would make HINS upgrade to 2 MW beam difficult. HINS planned for this upgrade.
  • Round ILC beam tunnel section is markedly smaller than HINS tunnel
  • Future uses such as recirculating muon acceleration not accounted for.

HINS/PD Civil – AAC Review May 10-12, 2006 Dixon Bogert

hins consultant work fy06
HINS Consultant Work FY06
  • Life Safety study completed that established code-related occupancy, exiting, and fire protection requirements for the proposed facility
  • Hydrogeologic borings to determine horizontal and vertical groundwater transport in vicinity of proposed linac absorber
  • Wetland delineation for south half of Tevatron Ring to scope what wetland mitigation would be required for installation of new facility in this region

HINS/PD Civil – AAC Review May 10-12, 2006 Dixon Bogert