1 / 7

Level 1 Muon Trigger Status

Level 1 Muon Trigger Status. Ken Johns University of Arizona for the L1 Muon Group. L1MU Trigger Card Status. Crate Manager (MTCM) Assembly complete Production testing in progress Trigger Motherboard (MTCxx) Assembly of first 16 complete Must swap 5V to 3V Altera part

esben
Download Presentation

Level 1 Muon Trigger Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Level 1 Muon Trigger Status Ken Johns University of Arizona for the L1 Muon Group

  2. L1MU Trigger Card Status • Crate Manager (MTCM) • Assembly complete • Production testing in progress • Trigger Motherboard (MTCxx) • Assembly of first 16 complete • Must swap 5V to 3V Altera part • Production testing in progress • Balance at assembly house • Trigger Manager Flavor Board (MTM MTFB) • Assembly complete • Production testing in progress

  3. L1MU Trigger Card Status • 05 Flavor Board (MTC05 MTFB) • At assembly house • 10 Flavor Board (MTC10 MTFB) • At assembly house but waiting for • Splitter Cards (MSPLIT) • Assembly complete • Two backplanes must be assembled • Infrastructure and Software • Production power supplies nearing test stage • Cable hookup continues during accesses

  4. MCEN Card Status • Crate Manager (MCCM) • Production version fabrication to start in early April • Centroid Finder (MCEN) • Production version at assembly house • Physics Boards (MCFB’s) • Production version at assembly house

  5. Card Completion Estimate

  6. L1MU 3/1-4/15 • Passed pORC • Reliable readout of L1MU Central and MTM crates • Two octants (Octant 2 MTC05 and Octant 1 MTC10 in place) • Simple triggers (OR’s) being sent to the trigger framework • More complex trigger FPGA programming in progress • Checkout of synchronization with data crates in progress • Checkout of data in progress • L1MU examine in progress

  7. L1MU 4/15-5/1 • Add production power supplies • Final ORC • Add North and South L1MU crate readout • One octant triggering in each of North and South • As many octants as available cards in Central

More Related