410 likes | 535 Views
Tape 5 - Early 60’s. Early Surf-Rock Teen idols Girl groups. This sound was something different and was gaining in popularity. Important Groups include: The Chiffons Betty Everett Claudine Clark The Dixie Cups The Paris Sisters The Ronettes The Shangri-las.
E N D
Tape 5 - Early 60’s • Early Surf-Rock • Teen idols • Girl groups
This sound was something different and was gaining in popularity. Important Groups include: The Chiffons Betty Everett Claudine Clark The Dixie Cups The Paris Sisters The Ronettes The Shangri-las The Girl Group Sound ’61-64
#1 US & R&B Charts for 4 weeks Female quartet from Bronx, NYC started out singing together in high school HE’S SO FINEThe Chiffons(1963)
# 5 US Charts ONE FINE DAYThe Chiffons(1963)
#10 US Charts SWEET TALKING GUYThe Chiffons(1966)
#6 hit R&B Singer/Pianist from Greenwood, MO The Shoop Shoop Song (It’s In His Kiss)Betty Everett(1964)
#5 Hit R&B Songwriter/singer from Philadelphia PARTY LIGHTSClaudineClark(1962)
#1 hit for 3 weeks Female vocal trio from New Orleans Sisters Barbara Ann and Rosa Lee Hawkins, with their cousin Joan Marie Johnson CHAPEL OF LOVEThe Dixie Cups(1964)
#8 Hit Vocal Group from New Jersey THE BOY FROM NEW YORK CITYThe Ad Libs(1965)
#5 Hit Vocal trio from San Francisco Albeth, Priscilla, and Sherrell Paris I KNOW HOW YOU LOVE ME***The Paris Sisters(1961)
#5 Hit Female vocal quartet from Queens, NY REMEMBER(Walkin’ In the Sand) TheShangri-Las (1964)
#1 hit Leader of the Pack The Shangri-Las (1964)
#1 Hit – 5 weeks Inducted into Rock & Roll Hall of Fame 1986 Influenced many rock groups singing style with clear 2-part harmonies Cathy’s Clown The Everly Brothers(1960)
#1 Jockey, Best Seller, Top 100 Country, and R&B Hit Wake Up Little Suzie TheEverly Brothers(1957)
#1 Top 100 and R&B hit for 3 weeks R&B/Doo Wop Vocal group from Pittsburgh,PA Blue Moon The Marcels(1961)
#1 hit for 7 weeks R&B singer from Detroit,MI Also songwriter and multi-instrumentalist Tossin’ & Turnin’ Bobby Lewis(1961)
#1 hit 4 weeks Born Charles Westover in Coopersville, MI Pop singer/songwriter Died of self-inflicted gunshot wound in 1990 1999 inductee Rock & Roll Hall of Fame Runaway Del Shannon (1961)
#1 hit 3 weeks Female R&B vocal group from Passaic, NJ 1996 inductees into Rock & Roll Hall of Fame Soldier Boy TheShirelles(1962)
#1 Hit 2 weeks Pop singer/actress from Santa Monica,CA Niece of actress Nanette Fabray Starred in several movies and TV shows Johnny Angel Shelly Fabres(1962)
#1 hit Top 100 and R&B Charts Made personal appearances in a long flowing robe and wearing a monacle. Duke Of EarlGene Chandler(1962)
#3 Hit Born James William Ercolani in Philadelphia Singer/actor starred in several movie - The Guns of Navarrone Regular on TV shows The Time Tunnel (60’s) and T.J. Hooker (70’s) Goodbye Cruel World ***James Darren(1961)
#3 hit Pop singer from Queens, NY #1 Hit 1960 with ItsyBitsy Teenie Weenie Yellow Polka Dot Bikini Sealed With a Kiss Brian Hyland(1962)
#1 hit Real name Eva Narcissus Boyd Discovered by famous songwriter duo Carole King and Gerry Goffin while babysitting their daughter Louise Carole King is a backing vocal on the song Locomotion Little Eva(1962)
“The blues had a baby and they called it Rock & Roll”-Muddy Waters • In the 60’s rock was more than “The musical Devil” • Rock was a way of seeing the world, a way of life: • Black, • white, • folkish, • psychedelic, • blusey- • it was all rock. The ’60s story was not only of Pop Art form, but the sound of a generation. • The first California sound to hit big was • Surf Music
Surf-Rock: The California Sound • It was the dominant sound of early 60s… • 45 years later it’s sound is still fresh • Surf music had a language all it’s own… • Your surf board was called a “woody…” • there were “2 girls for every boy”… • And the overall themes of almost every song were… • Surfing, partying, waxing your board, checking out the surf, or flexing your muscles.
The California surf cult spread to a national phenomenon and California was cool. They had perfected the art of being laid back and not being fazed by anything. Hundreds of electric guitar surf-bands sprang up including: Dick Dale The Surfaris The Ventures The Challengers Jan & Dean The Beach Boys Surf-Rock: The California Sound
#2 hit Surf group from Glendora,CA Re-released in 1966 reached #16 on the charts Wipeout The Surfaris (1963)
#4 one-hit wonders Teen-age surf rock group from Santa Ana, CA Pipeline The Chantays(1963)
#28 on charts #1 hit for Buddy Clark in 1947 Surf-rock male duo from Los Angeles,Ca Jan Berry and Dean Torrence Started out recording in a garage Linda Jan & Dean(1963)
#1 hit for 2 weeks Jan and Dean had a major influence on the musical style of The Beach Boys Brian Wilson of The Beach Boys sings backing vocal and arranged the music Dean sang lead vocal on the Beach Boys’ Barbara Anne Surf City Jan & Dean(1963)
#11 hit Use of steel slide guitar for Hawaiian effect Honolulu LuluJan & Dean(1963)
#10 hit Note the use of falsetto singing which influenced the Beach Boys Drag City Jan & Dean(1963)
#34 hit The New Girl in School Jan & Dean(1964)
Jan was critically injured in a car crash in 1966 The duo made a comeback in 1978 after their biographical movie Dead Man’s Curve aired on TV. Dead Man’s Curve Jan & Dean(1964)
#2 hit Instrumental group from Seattle Re-released hit #8 in 1964 Walk - Don’t Run TheVentures(1960)
#4 hit Theme from the TV series starring Jack Lord Five-0 is police radio code for homicide Hawaii Five-0 The Ventures(1969)
Doo Wop group out of LA Dootone Records #359 one of the biggest new vocal groups on the West Coast. Heaven & ParadiseDon Julian & The Meadowlarks(1955)