VELO Software Overview & Shutdown Planning

VELO Software Overview & Shutdown Planning. Organisation Milestones 3 Critical Areas. Areas & Responsibilities. Overall Co-ord: CP PVSS: Stefano De Capua DAQ Recipes: Karol Hennessy Timing & Gain: Kazu Akiba Error Bank Analyses: Ann van Lysebetten Online Monitoring: Kurt Rinnert

elmob
Download Presentation

VELO Software Overview & Shutdown Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VELO Software Overview &Shutdown Planning Organisation Milestones 3 Critical Areas

  2. Areas & Responsibilities • Overall Co-ord: CP • PVSS: Stefano De Capua • DAQ Recipes: Karol Hennessy • Timing & Gain: Kazu Akiba • Error Bank Analyses: Ann van Lysebetten • Online Monitoring: Kurt Rinnert • Data Quality: Eduardo Rodrigues • Simulation & Reconstruction: Tomasz Szumlak • Tracking: David Hutchcroft • Alignment: Silvia Borghi • Closing Strategy: Malcolm John • > 20 people contributing • Milestones defined for each, with one person responsible and priorities assigned

  3. Organisation • Weekly Monday commissioning meeting • Report on previous week milestones • News from all, forum for discussing issues • Work plans for the week • Integration Days: Thursdays • Integrate weekly releases (if any) at pit • Release: PVSS, recipes, Vetra • Brief report bi-weekly Friday meeting • Report progress to whole group, no details • Specific presentations on items of general interest • Shutdown progress logged on milestone Twiki page https://lbtwiki/bin/view/VELO/SoftwareMilestones

  4. Milestone Progress • Proceeding close to schedule • Some delays due to FEST’08 production

  5. Critical Path • In September identified three key areas where progress is needed before we start running this year • Timing • TELL1 Parameter Uploading • Monitoring

  6. Timing studies • Set up timing for sampling of pulse train and for optimal analogue signal height • Automated timing scans implemented and being tested • Firmware release being tested

  7. Delayed Sampling phase Delayed pulse Digitisation Delay ADC Counts 5 3 4 6 Time (CLK/channels) Measured Voltage ARx Clock

  8. Analogue Sampling Delay Scan Points Sampled points for a given clock ADC Counts Delayed pulse 75 25 50 100 Time (ns) Beetle Clock First Time Sample Second Time Sample Third Time Sample Fourth Time Sample ...

  9. TELL1 Data Processing Pedestal Following Beetle Cross-talk Correction Cable Cross-talk Filter (FIR) Common Mode Suppression (MCMS) Beetle baseline shift Reordering Common Mode Suppression (LCMS) Clusterization • Velo Data Processing Raw -> Clusters in TELL1 RAW • Require 1M parameters • Optimisation critical for data quality (see TED data talk) • Pedestal & Clusterisation Thresholds most important • Bit Perfect Emulation of Algorithms in full LHCb Software Framework Lower priority Lower priority CLUSTERS

  10. Vetra – TELL1 Emulation • Parameter uploading achieved for first time in December • Firmware fixes made and used (November) • Testing & evaluation underway

  11. Pedestal Processing Raw data Pedestal corrected data Pedestal correction monitoring Base line (zero) level after pedestal correction

  12. Beetle X-talk correction Beetle X-talk effect first channel in each analog link is affected Noise after pedestal correction Measured noise in first channel before correction Beetle X-talk correction monitoring Noise in first channel after correction Average noise measured in unafected channel

  13. Effect of tuning ADC count ADC count Constant Pedestal Only All Parameters tuned Non-Zero Suppressed Data critical – so that tuning parameters can be obtained Procedure to take automatically during data - One module at a time, under test

  14. Monitoring • Monitoring package • Package for “high-level” (= ZS) data • Monitoring based on clusters and tracks • Package for NZS data • Noise calculation, time alignment study, beetle pulse shape, … • Scripts and macros are being developed to analyse data • Wiki pages with documentation and HowTo’s Review of Monitoring status in February

  15. Online monitoring • Running since August • Implementation of several plots • New features to be exploited Online presenter

  16. Cluster Monitoring • Cluster information: • Cluster ADC value • Active chip links • Number of strip in a cluster • Cluster ADC value versus sampling • Number of cluster per events • More… Some of these distributions versus sensor number and/or sensor strip

  17. Example distributions from VeloRecMonitors

  18. Track Monitoring • Tracks • Number tracks • Pseudo-rapidity • Azimuthal Angle • Pseudo-efficiency • Biased and unbiased Residuals versus sensor number • Total number of R cluster per track • Vertex information • Hits distribution in xy and xz • Mean sigma of residuals versus of sensors • More…

  19. Track monitoring: J/() Ks Pseudo rapidity Azimuthal angle X(cm) BiasedRes R  Sensor # Z(mm)

  20. Script and Macros • Analysis of the data for the evaluation for: • Time alignment study, • Noise calculation, • High voltage scan, • beetle pulse shape, • More…

  21. Noise monitoring macros – example of GUI

  22. Noise monitoring macros – example of GUI Common mode subtraction No common mode

  23. Noise performance HP1 HP2 HP3 HP4 • Common mode pickup from beam requires data • At pit and in previous testbeams parameters highly stable

  24. Noise – individual / whole system No evidence that operation of full system induces more noise than single sensors

  25. Noise versus Voltage Expected Signal / Noise

  26. IV - scans • PVSS recipes available to automate IV scans • Set initial voltage, target voltage, step, single or set of sensors • A data file produced per sensor containing channel number, voltage, current, sensor temperature • Analysis scripts for plotting IV scan data

  27. Software Commissioning Summary • All baseline algorithms • Completed for summer ’08 • Commissioning software • Milestones for data readiness in April 2009 • 3 critical areas all proceeding according to plan • TED data are the VELO ‘cosmics’ Tremendous success of first tracks This sample has been very useful for comissioning TED data this summer will allow us to: Optimise timing Test and tune FPGA algorithms Increase alignment accuracy