1 / 39

Breakout Session #1505 Bradley Niese, Contracting Officer Exploration Systems Procurement Office

Project Orion: An Acquisition Overview of NASA’s Next Human Spacecraft, the Crew Exploration Vehicle. Breakout Session #1505 Bradley Niese, Contracting Officer Exploration Systems Procurement Office NASA Johnson Space Center Jose Garcia, Manager Exploration Systems Procurement Office

elke
Download Presentation

Breakout Session #1505 Bradley Niese, Contracting Officer Exploration Systems Procurement Office

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Orion: An Acquisition Overview of NASA’s Next Human Spacecraft, the Crew Exploration Vehicle Breakout Session #1505 Bradley Niese, Contracting Officer Exploration Systems Procurement Office NASA Johnson Space Center Jose Garcia, Manager Exploration Systems Procurement Office NASA Johnson Space Center April 15, 2008 2:10 – 3:10 pm

  2. Agenda • Introduction • Project Overview • Project Objectives & Goals • Acquisition Strategy • Progressive Competition Down-Selection Process • Contract Structure Formulation • Rewarding Performance Incentives • Technical Resources Information • Cost & Price Information • Other Acquisition Innovations • Lessons Learned & Best Practices • Questions

  3. Introduction A Bold Vision for Space Exploration • Complete the International Space Station • Safely fly the Space Shuttle until 2010 • Develop and fly the Orion Crew Exploration Vehicle no later than 2014 • Return to the Moon no later than 2020 • Extend human presence across the solar system and beyond • Implement a sustained and affordable human and robotic program • Develop supporting innovative technologies, knowledge, and infrastructures • Promote international and commercial participation in exploration

  4. Introduction • Orion development is a joint effort involving every NASA Center, and is led by the Orion Project Office at Johnson Space Center (JSC) • The Orion Project Reports to the Constellation Program Office, also at JSC • The Constellation Program is a key program in NASA’s Exploration Systems Mission Directorate (ESMD) in Washington, DC • ESMD is responsible for managing and integrating the programs and projects necessary to accomplish the VSE

  5. Introduction

  6. Project Overview

  7. Project Overview • The Orion Crew Exploration Vehicle (CEV) is America’s next generation human spacecraft • Will provide human and cargo transportation to Low Earth Orbit, the Moon and beyond • Lockheed Martin is NASA’s prime contractor for design, development, testing and construction of Orion • Diverse Government and Industry project management team

  8. Project Overview NASA’s Next Human Spacecraft: Orion (CEV) Ares I (CLV)

  9. Project Overview Orion consists of four functional modules

  10. Project Overview Orion Project Life Cycle - We Are Here

  11. Project Overview Each test has its own Project Life Cycle within the overall Orion Project Life Cycle

  12. Project Objectives & Goals

  13. Project Objectives & Goals • Incorporate lessons learned from previous NASA development programs • Definitive end to the Design, Development, Test and Evaluation (DDT&E) phase of the contract • Isolate and track recurring cost of production • Maximize use of existing technology • Utilize effective incentives during each stage of the project life cycle • Minimize life cycle cost • Structure the contract to accommodate ability to evolve throughout the project life cycle.

  14. Acquisition Strategy

  15. Acquisition Strategy • Orion was a Phased Acquisition Using Progressive Competition (NASA FAR Supplement 1852.217-72) • Progressive Competition Background: • Down-selection strategy for phased acquisitions • Single solicitation is issued for all phases of the program • Initial phase contracts are awarded • Contractors for subsequent phases are chosen through a down-selection process from the preceding phase contractors • Progressively fewer contracts are awarded in each phase until a single contractor is chosen for the final phase

  16. Acquisition Strategy • NASA’s Planning for the Phased Acquisition • Decision to use down-selection strategy must be made prior to release of initial solicitation • Rationale documented in acquisition plan must address all phases of the acquisition • When using down-selection, both the initial and all subsequent phase(s) are considered full and open competition • Down-selection should not be used if a direct link cannot be made between successful performance in the preceding phase and successful performance in a subsequent phase

  17. Acquisition Strategy • NASA’s Implementation of the Phased Acquisition: • Utilized two-phases • Considered to be a diligent and cost effective investment • Phase 1 contracts awarded to Northrop Grumman and Lockheed Martin • Phase 2 down-select was awarded to Lockheed Martin for DDT&E of initial CEV with options for production and sustaining engineering of future CEVs

  18. Acquisition Strategy • NASA’s Results from the Phased Acquisition: • Great amount of insight gained through the “learning curve” inherent with this approach • Provided insight into successful Phase 1 offerors, how they were organized, technical approaches, business practices, etc., streamlining and speeding the Phase 2 evaluation process • Source Selection Authority gained unique insight into performance as a result of Phase 1, and it served as a notable element of the Past Performance Evaluation in Phase 2 • Captured lessons learned from Phase 1 specifically those pertinent to source selection procedures

  19. Acquisition Strategy • Phase 2 Contract Structure Formulation • Started with project goals and objectives in mind which drove to the resultant contract structure • Contract built around three unique contract schedules • Schedule A- DDT&E • Schedule B- Production • Schedule C- Sustaining Engineering and Operations Support • Each schedule was uniquely structured to accomplish the project goals • Goal to provide NASA with maximum flexibility to achieve successful project requirements during each unique phase of the project life cycle

  20. Acquisition Strategy • Schedule A- DDT&E • DDT&E and initial production • Cost Plus Award Fee • Performance Based • Incorporates both completion form and indefinite delivery / indefinite quantity (IDIQ) • Completion Form for DDT&E • IDIQ for operations support and initial flight spares • Schedule A ends upon delivery and flight of the initial production variant Orion • Provides for a definitive end to DDT&E • End item award fee using milestone based evaluation periods • Schedule A contains option for Schedules B & C (Production and Sustaining Engineering)

  21. Acquisition Strategy • Schedule B- Production • Future production and refurbishment of Orion • IDIQ Cost Plus Incentive Fee leading to Fixed Price Incentive Delivery Orders • IDIQ arrangement permits: • Negotiating prices for vehicles as knowledge base continuously matures (e.g. capturing learning efficiencies, economies of scale, etc.) • Flexibility to deal with changes in manifest and program direction • Incentivizing each delivery order uniquely based on current needs of the program (i.e. schedule, cost, etc.) • Permits isolation of recurring cost of production

  22. Acquisition Strategy • Schedule C- Sustaining Engineering and Operations Support • Sustaining engineering and operations to support each variant produced under Schedule B • Concurrent with Schedule B • Covers the scope of any non-recurring costs during production and operations support • IDIQ Cost Plus Award Fee Task Orders • IDIQ arrangement permits NASA flexibility to control effort as needed depending on manifest, budget, etc.

  23. Acquisition Strategy • Focus on Rewarding Performance Incentives • Maximize return on investment for the Government and contractor • Milestone based that incentivize successful outcomes • Contract Incentives: • Schedule A DDT&E is end-item based, milestone driven award fee • Schedule B Production is incentive fee per delivery order • Schedule C Sustaining Engineering is award fee per task order

  24. Acquisition Strategy • Schedule A- End Item Award Fee • Interim evaluation periods based on scheduled project milestones (e.g. SDR, PDR, CDR, test flights, first human launch, etc.) • Milestones established to incentivize schedule performance • All award fee determinations are considered interim except for the last award fee determination, which is final • Schedule B- Incentive Fee • IDIQ arrangement permits NASA to incentivize each delivery order uniquely based on current needs of the program (i.e. schedule, cost, etc.) • Based on completion of each delivery order • Schedule C- Award Fee • Follows traditional NASA standard award fee structure for services • Based on completion of Task Orders • Evaluations occur every 6 months

  25. Acquisition Strategy • Technical Resources Volume • Contained all proposed resources and the basis of estimate • Labor and Non-labor • Bridges the cost volume with the technical and management volumes • Emphasis placed on understanding of the requirements, efficiencies proposed, and a comprehensive basis of estimate • Facilitated the cost realism analysis • Organized by Work Breakdown Structure (WBS) which allowed proposal evaluators to focus in on their pertinent areas of expertise • Positive feedback from both offerors on this approach Technical Resources Volume Technical & Management Volumes Cost Volume

  26. Acquisition Strategy • Cost & Price Information • Obtained two cost models: Government Provided (standardized) & Offeror Provided (customizable) • RFP defined standard labor categories to which offerors mapped their internal labor categories • Hours priced out in cost model were converted from Full Time Equivalents (FTE) proposed in the Technical Resources Volume • Cost and resources data requested at the highest level possible to keep evaluators focused but still permit a comprehensive evaluation

  27. Acquisition Strategy • Other Acquisition Innovations • External Review Teams and Independent Consultants • Early release of Draft Statement of Work and Draft Data Deliverable Documents • Industry Day and Pre-proposal Conferences • Electronic based Bidders Library • Utilized a web-based management information system to share non-source selection sensitive information with the offerors and coordinate reviews across the Agency • Engaging and interactive approach at Oral and Written Discussions

  28. Lessons Learned & Best Practices

  29. Lessons Learned & Best Practices • Refined Requirements • Requirements definition speeds every aspect of source selection • Requirements must “earn their way” into contract: Number of Data Deliverables, Project Reviews, etc. • Focus on performance outcomes and allow Industry to determine best way to achieve desired outcome • Allow and encourage industry to suggest alternatives • Use commercial practices if it’s available and better • Allow adequate time for meaningful discussions • Technical Resources Volume facilitates traceability from technical and management volumes to the cost volume

  30. Summary

  31. Summary • Through innovative acquisition planning and source selection techniques, NASA has a contract that provides the coverage and flexibility needed for a spacecraft development, production, and sustaining effort.

  32. Questions & Backup

  33. Components of the Constellation Program Earth Departure Stage Orion - Crew Exploration Vehicle Ares V- Heavy Launch Vehicle Altair- Lunar Lander Ares I- Crew Launch Vehicle

  34. Building on a Foundation of Proven Technologies Crew Lunar Lander Lander Earth Departure Stage (EDS) (1 J-2X) Upper Stage (1 J-2X) S-IVB (1 J-2 engine) S-II (5 J-2 engines) 5-Segment Reusable Solid Rocket Booster (RSRB) Core Stage (5 RS-68 Engines) S-IC (5 F-1) 5-Segment 2 RSRB’s Ares I Ares V Saturn V Space Shuttle

  35. Orion Lunar Mission – Getting There • Orion mates with Earth Departure Stage (EDS) placed in LEO on prior launch • EDS stack boosted to lunar trajectory • EDS • Altair Lunar Lander • Orion: up to 4 crew

  36. Orion Lunar Mission – Arriving There • Orion and Altair enter lunar orbit • Altair descends to lunar surface for up to 7 day sortie • Orion is uninhabited during lunar surface operations • Altair ascent stage returns to Orion in lunar orbit

  37. Orion Lunar Mission – Coming Home • Orion provides Earth return trajectory and attitude control during coast phase • CM capsule reenters atmosphere • Parachute descent • Landing in water or on land for recovery operations

  38. Orion will deliver crew and cargo to ISS Up to 6 crew members on Orion 210 day stay time ISS crew rotation Emergency lifeboat for entire ISS crew

More Related