An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reconstruction in JIM: status and plan Gabriele Garzoglio Sep , 13 2004

  2. The Goal • Submit a reconstruction job to the SAM-Grid infrastructure from any JIM client installation • Execute the reconstruction job to any SAM-Grid execution site • No d0 software release is assumed to be pre-installed at the site • Refine monitoring using the JIM information management infrastructure Gabriele Garzoglio

  3. Status • Working on the infrastructure at the execution site • Iain has provided a tar bal of p14.06.02 that can be used together with mc_runjob to do reconstruction on a “bare” node • The tar ball has been tested interactively on a single local file and needs a few additions (mainly the RCP database). Gabriele Garzoglio

  4. Short term plan • Store the tar ball (+ RCP db) into SAM • Write a jim-job-manager plug in, in order to submit the reco job to a batch system • Submission tests can be done at samgfarm • Eventually the submission will be triggered via the grid • A wrapper around the job will prepare the execution environment: • It will ask SAM for the tar ball, mc_runjob and an input file • It will generate the runjob macro Gabriele Garzoglio

  5. Longer term plan • Enhance the jim-job-manager plug in to submit parallel batch jobs • Have mc_runjob talk to sam to get the input files (as opposed to doing it in the job preparation wrapper) and store the output • Write a client plug in to pass the user information to the jim-job-manager • Start testing submission over the grid Gabriele Garzoglio

  6. Open questions 1 • What information does the client need to pass to the job? • input sam dataset • d0reco version • binary sam dataset • ??? • Is this information going to be encapsulated into a request system? Gabriele Garzoglio

  7. Open questions 2 • What is the model of grid job submission? • Deal with the reco of 100 or 1,000 or 10,000 files as a single grid job? • What policy of local job submission should we enforce? • Submit as many local jobs as files in the dataset, processing only a file per job • Submit a fixed number of jobs that will process the whole dataset • ??? Gabriele Garzoglio