krong pa 2 hydropower PLANT. Tran Thanh Lien, Institute of Energy, Vietnam. FEASIBILITY STUDY, VIETNAM 2005. GENERAL. Krong Pa 2 hydropower is located in Krong Pa river which is one of tributaries of Ba river.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'krong pa 2 hydropower PLANT' - edison


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
krong pa 2 hydropower plant
krong pa 2 hydropower PLANT

Tran Thanh Lien, Institute of Energy, Vietnam

FEASIBILITY STUDY, VIETNAM 2005

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

general
GENERAL
  • Krong Pa 2 hydropower is located in Krong Pa river which is one of tributaries of Ba river.
  • The dam site is located in DakRong commune, KBang district, Gia Lai province, Vietnam

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

main objectives
MAIN OBJECTIVES
  • Krong Pa 2 hydropower plant is to supply partly electricity to Kbang district with annual average electricity production of 24.5 x 106 KWh
  • The project is expected to contribute to impulse for local economic and social development

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

eco social conditions
ECO-SOCIAL CONDITIONS
  • In this area, mainly ethnic minorities of Ba Na, E De, etc live with low density.
  • Local life is poor, local inhabitants mainly earn their livings by husbandry and exploitation of forest products. Their life will be improved (by creating jobs, processing agricultural products, etc.) when the hydropower plant comes in.
  • The area owns convenient access road to the site. Road No. 669 A passes through powerhouse area and is 200 m far from the powerhouse. Access road to the dams is sloped gently along the riverside and convenient for construction. The distance from powerhouse to the dams is 2.5 km

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

layout of headworks
LAYOUT OF HEADWORKS

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

main features of project catchment parameters
MAIN FEATURES OF PROJECTCatchment parameters
  • Catchment area: 99 km2
  • Annual average flow: 2.71 m3/s
  • Flood discharge P = 0.2%: 1,008 m3/s

Flood discharge P = 1.0% 733 m3/s

Flood discharge P = 5.0% 478 m3/s

Flood discharge P = 10% 378 m3/s

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

main features of project reservoir parameters
MAIN FEATURES OF PROJECTReservoir parameters
  • Full Supply Level, FSL: 979.0 m
  • Minimum Operating Level, MOL: 977.5 m
  • Total storage capacity: 82.38 x 103 m3
  • Active storage capacity: 61.31 x 103 m3

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

main features of project dam and spillway parameters
MAIN FEATURES OF PROJECTDam and Spillway parameters

DAM

  • Dam type: Concrete Gravity
  • Crest elevation: 985 m.a.s.l
  • Crest length: 85.83 m
  • Max height: 9.52 m

SPILLWAY

  • Sill elevation: 979 m.a.s.l
  • Spillway Design Discharge: 1,008 m3/s
  • S

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

main features of project waterway parameters
MAIN FEATURES OF PROJECTWaterway parameters

INTAKE

  • Crest elevation: 985 m.a.s.l
  • Sill elevation: 975.48 m.a.s.l
  • Number of intake gates: (bxh) 1 unit (2x1.8)

TUNNEL

  • Length: 2,420 m
  • Cross section dimension (bxh): 2 x 1.8

PENSTOCK

  • Inner Diameter: 1 m
  • Length: 824 m
  • I

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

cross section of power station
CROSS SECTION OF POWER STATION

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

main features of project power station parameters
MAIN FEATURES OF PROJECTPower Station parameters
  • Install Capacity: 5.80 MW
  • Firm Capacity: 0.88 MW
  • Number of units: 2 units
  • Type of Turbine: Francis
  • Max Water Head: 267.96 m
  • Design Water Head: 249.90 m
  • Turbine Design Discharge: 2.80 m3/s

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

design work progress
DESIGN WORK PROGRESS
  • Under Vietnamese standard, TCXD VN: 285 - 2002, based on the design parameters as FSL of 979 m, dam height of 9.52, and install capacity of 5.4 MW, the Krong Pa 2 hydropower project should be project at level III.
  • Based on the previous studies on topographic and geological conditions at project site, two alternatives 1&2 are compared to select the best dam site.
  • Alternatives of FSL will be either 978 m or 980 m, with daily regulation or non- regulation. Consideration for alternatives of install capacity and number of units.

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

main civil work 1
Main Civil Work (1)

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

main civil work 2
Main Civil Work (2)

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

interconnection current situation of power system in k bang district
INTERCONNECTION Current situation of power system in K'Bang district
  • At present, K’Bang is supplied electricity with 22kV network from feeder to K’Bang substation of 22 km length, AC-70 line. K’Bang substation owns three feeders of 22kV supplying electricity to the communes, including Dak Rong which supplied with electricity from feeder of 474 with the length of 40 km, AC-70 and AC-50 line.
  • Currently, P max of entire district reaches 2600kW .

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

interconnection power system development plan up to 2020 in k bang district
INTERCONNECTIONPower system development plan up to 2020 in K'Bang district
  • Transformer of 110/35/22kV- 16MVA is planned to install in K’Bang. The transformer both supplies the district with electricity and transmits electricity from 13 MW-Ka Nak, 5.8 MW Krong Pa 2 hydropower stations to national power grid. It will meet the district’s power demand with electricity through 22 kV and 35 kV power network.
  • At Plan on PowerDevelopment of Gia Lai province period 2004-2010 perspectives up to 2015 prepared by Institute of Energy, Pmax is forecasted to reach 3610kW by 2005 and 5700kW by 2010 .

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

interconnection interconnection plan for krong pa 2 project
INTERCONNECTIONInterconnection plan for Krong Pa 2 project
  • From Krong Pa 2 hydropower project, the line goes along the road No. 699, passing through the communes of Dak Rong, Son Lang, So Pai, Xa Dong and K’Bang village to 110kV K’Bang transformer
  • The expecting line is about 55km, it will pass through the smoother area. Almost line is closed to the road, thus convenient for installation and operation.

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

environmental and social impact assessment
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT
  • Physical environment. construction of KrongPa 2 hydropower project will give inconsiderable impact on physical environment. Reservoir bed does not cover any industrial minerals
  • Ecological environmentKrong Pa 2 hydropower project does not give any bad impact on ecological environment and gives insignificant ones on biological diversification. As the small reservoir, the impacts on surrounding are inconsiderable
  • Socio-economical situationAnnually, Krong Pa 2 hydropower project will supply national power grid with its electricity of 24.48 x 106 kWh /year, making significant contribution to socio-economic development.

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

construction shedule
CONSTRUCTION SHEDULE
  • Krong Pa 2 hydropower project is planned to construct within 2.5 years, 6 months among them will be spent for preparation.

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

total investment capital
TOTAL INVESTMENT CAPITAL

Total investment cost (not including IDC)

100.58 billion VND

of which:

1. Construction:52.72 bil. VND

2. Equipment: 31.10 bil. VND

3. Other cost: 7.62 bil. VND

4. Contingency: 9.14 bil. VND

Total investment capital: 107.55 billions VND

KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam 2005

conclusion
CONCLUSION
  • Based on calculations in the Fs it may be concluded that the proposed development of Krong Pa 2 Hydropower Project would be economically viable and friendly with environment.